Laserfiche WebLink
. i <br /> i � <br /> ; _ i OWE'S OF ZEPHYRHILLS,FL 09/Ol/2003 <br /> Y SECTION 093IQI0—CERAMIC TILE <br /> � <br /> PART 1 -GENERAL <br /> � � <br /> i <br /> 1.01 RELA� � D DOCLJMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br /> Divis�on 1 Specification Sections,apply to this Section. <br /> ii , <br /> 1�.02 SUMIv1'ARY <br /> A. This Section includes the following <br /> 1. Porcelain floor tile. <br /> 2. Porcelain Wall tile <br /> � <br /> 1.03 REFER�ENCES <br /> A. American national Standards Institute(ANSI): <br /> 1. A��108.5-Installation of Ceramic tile with Dr�Set Portland Cement or Latex-Portland Cement. ' <br /> 2. A�108.10-Installation of Grout in Tilework. �' <br /> 3. A108.13-Installation of Membranes for ThirrSet Ceramic Tile. <br /> 4. Afl!18.4-Latex-Portland Cement Mortar. <br /> 5. A,118.6-Ceramic Tile Grouts. <br /> 6. A�137.1 -Ceramic Tile <br /> " B. American Society for Testing and Materials(ASTM): <br /> 1. C'136-Sieve Analysis of Fine and Coarse Aggregates. <br /> 2. C 1�44-Aggregate for Masonry Mortar. <br /> 3. CI1�50-Portland Cement. <br /> 4. C�627—Robinson Floor Test for Tile Service Level. <br />� 5. C j 1b28-Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal D�- <br /> namometer Pull-Meter Method. <br /> C. TCA Handbook for Ceramic tile Installation by Tile Council of America,latest edition. <br /> 1.04 SUBMIT"I'ALS <br /> A. The General Contractor and the Sub-Contractor must execute the provided Conformance Submittal for each <br /> produet�specified. <br /> 1.OS PROJECT CONDITIONS <br /> A. Mainta'�n a temperature of not less than 72 deg F or more than 95 deg F in spaces to receive floor tile for at <br /> least 48 hours before installation, during installation, and for at least 48 hours after installation, unless <br /> manufacturer's written recommendations specify longer time periods. <br /> l. A$�er post installation period,maintain a temperature of not less than 72 deg F or more than 95 deg F. <br /> B. Install floor tile after other finishing operations,including painting,have been completed. <br /> C. All concrete surfaces that are to receive ceramic tile shall be inspected by the installing contractor,if found <br /> unsatisfactory the work of laying the ceramic tile shall not commence until the defective surfaces have been <br /> made satisfactory. Beginning work constitutes an acceptance of the base concrete flooring. <br /> ].06 QUALIiTYASSURANCE <br /> A. The work covered by this Section of the specifications includes the furnishing of all labor, equipment, <br /> appliances, materials and the performing of all operations in connection with the laying, installing and <br /> finishing of all ceramic tile in strict accordance with the applicable drawings, schedules, and the approved <br /> samples and color selection. , <br /> B. SINGLE SOURCE RESPONSIBILITY: ii <br /> 1. Tile: Minimum 5 years experience in manufacture of tile products. II <br /> 2. Setting Materials: Minimum 10 years experience in manufacture of setting and grout materials <br /> - „ specifed. <br /> C. INSTALLER QUALIFICATIONS: <br /> 1. Specializing in tile work having minimum of 5 years successful documented experience with work <br /> . .. comparable to that required for this Project. <br /> � ; <br /> I <br /> CERAMIC,TILE 09300-1 <br /> evision#3, OS/26/04 <br />