Laserfiche WebLink
. , <br /> , = L�DWE'S OF ZEPHYRHILLS,FL 06/02/2003 <br /> „ S�CTION 08461 -SLIDING AUTOMATIC ENTRANCE DOORS <br /> � , i <br /> P ART 1 -GENERAL <br /> :� � I <br /> � <br /> 1.01 RELATED DOCUMENTS <br /> A. Drawin'gs and general provisions of the Contract, including General and Supplementary Conditions and <br /> Division 1 Specification Sections,apply to this Section. <br /> i � <br /> i <br /> l '02 SUMMARY <br /> A. 1'his Section includes automatic entrance door systems with automatic, biparting sliding operation (as <br /> indicated on drawings). <br /> B. See.Division 8 Section "Door Hardware"for lock cylinders. <br /> C. See Division 8 Section "Glazing"for glazing requirements for automatic entrance doors <br /> i <br /> 1:03 PERFORMANCE REQUIREMENTS <br />� A. General� Provide automatic entrance door systems that have the following capabilities based on testing <br /> manufac,turer's standard units in assemblies similar to those indicated for this Project: <br /> 1. Operating Temperature Range: Door operators capable of operating between minus 10 deg F and plus <br /> 120'deg F(minus 23 deg C and plus 49 deg C). <br /> 2. Maximum Opening Force: <br /> a. Exterior poors: 15 ]bf(67 N). ' <br /> b. ,Interior poors: 5 lbf(22.2 N). <br /> I � <br /> � <br /> 1.�04 SUBMITTALS <br /> A. Product Data: For each type of sliding automatic entrance door indicated. Check plans for total number of <br /> automatics,masonry opening sizes and door configurations. <br /> B. Shop Drawings: Include plans, elevations, sections, details, hardware mounting heights,wiring diagrams, <br /> and attachments to other Work. Also, shop drawings indicate that all assemblies meet local area wind load <br /> requirements(minimum 70 mph wind velocity),if requested. <br /> C. Hardware Schedule: Organize schedule into sets based on hardware specified. Include name of item and <br /> manufa�c�turer, and complete designation of every item required for each automatic entrance door. Use <br /> same reference designations indicated on Drawings and Door Schedule. <br />, D. Maintenance data. <br /> I <br /> i <br /> 1.05 QUALIT'Y ASSURANCE <br /> A. Installei Qualifications: A qualified installer, approved by manufacturer to install and maintain <br /> manufa�cturer's products. <br /> B. Manufacturer's Certificate: Issued by the American Association of Automatic Door Manufacturers. <br /> C. Welding�Standards: Comply with AWSD1.2, "Structural Welding Code--Aluminum." <br /> D. ANSI (American National Standard Institute)BHMA (Builders Hardware Manufacturers Association) <br /> � Standard: ANSIBHMA A156.10, "Power Operated Pedestrian Doors." <br /> E. UL Standard: Provide power door operators that comply with UL 325. <br /> F. Emergericy Exit Door Requirements: Comply with requirements of authorities having jurisdiction for <br /> automatic entrance doors serving as a required means of egress. <br /> G. Preinstalllation Conference(if requested by Owner): Conduct conference at Project site. <br /> 1.06 COORDINATION <br /> �A. Coordinate size and location of recesses in concrete floors for automatic entrance door components. <br />' Concre�e, reinforcement, and formwork requirements are specified in Division 3 Section "Cast-in-Place <br /> Concrete."(if indicated on drawings). <br /> 1.07 WARRANTY <br /> - :.. �A. Special IWarranty: Manufacturer's standard form in which manufacturers agrees to repair or replace <br /> components of automatic entrance door system that fail in materials or workmanship,excessive air leakage, <br /> faulty operation of operators and hardware, or deterioration of inetals, metal finishes, and other materials <br /> : � beyondlnormal weathering within one year from date of Final Acceptance. <br /> SLIDING AUTOMATIC ENTRANCE DOORS 08461 -l <br /> Rievision#3, 0'S%26/04 <br />� � <br />