My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6606 STADIUM DR (2)
Zephyrhills
>
Building Department
>
Building Plans
>
6606 STADIUM DR (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 11:05:05 AM
Creation date
5/2/2017 10:57:54 AM
Metadata
Fields
Template:
Building Plans
Street #
6606 STADIUM DR
Location
STADIUM DR
Contractor
RONALD E HUFF
Building Plans - Permit #
DIALYSIS CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> � � � <br /> �II � I SUPPORTS AND ANCHORS <br /> � I SECTION 15140 <br /> � <br /> ,I ' I <br /> 3. PART 3- EXECUTION <br /> �I � i <br /> �� 3.1 PREPARATION: Proceed with installation of hangers, supports and anchors when building <br /> � sfructural work has been completed and prior to fireproofing. Correct inadequacies, including <br /> I proper placement of inserts, anchors and other building structural attachments. <br /> ,� � <br /> � 3.2 INSTALLATION OF BUILDING ATTACHMENTS <br /> � AI. Install building attachments for piping support. Space attachments as indicated in MSS <br /> �� , SP-69, unless otherwise indicated or specified. Install building attachments for <br /> � � concentrated loads, including equipment, valves, flanges, guides, strainers, expansion <br /> � j joints and changes in direction of piping. <br /> i <br /> � I <br /> � B�. Concrete: Install concrete inserts before concrete is placed; fasten insert securely to <br /> I forms. Where concrete with compressive strength less than 2500 psi is indicated, install <br /> � reinforcing bars through openings at top of inserts. Prior to placing concrete, install nut <br /> ' ' � in insert and screw threaded rod through nut until rod is firmly against top of insert body. <br /> � <br /> 3.3 PROVISIONS FOR MOVEMENT _ <br /> i4. Install hangers and supports to allow controlled movement of piping systems and to <br /> II permit freedom of movement between pipe anchors, and to facilitate action of expansion <br /> I I joints, expansion loops, expansion bends and similar units. <br /> I � <br /> � B. Load Distribution: Install hangers and supports so that piping live and dead loading and <br /> �I ! stresses from movement will not be transmitted to connected equipment. <br /> � I <br /> ,� iC. Pipe Slopes: Provide indicated pipe slopes, and do not exceed pipe deflections allowed <br /> ,� i by ANSI 631. <br /> I <br /> �I �D Insulated Piping: Comply with the following installation requirements: <br /> � � � 1. Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting <br /> � � through insulation; do not exceed pipe stresses allowed by ANSI B31. <br /> I i I 2. Shields: Where low-compressive-strength insulation or vapor barriers are indicated <br /> I i � on cold or chilled water piping, install coated protective shields. For pipe 8" and <br /> � ; i over, install wood insulation saddles or factory equivalent. <br /> � � 3. Saddles: Where installation without vapor barrier is indicated, install protective <br /> � saddles. <br /> � � � <br /> ! 3.4 �INSTALLATIONOFANCHORS <br /> � il <br /> � !A. Install anchors at proper locations to prevent stresses from exceeding those permitted <br /> I � by ANSI B31, and to prevent transfer of loading and stresses to connected equipment. <br /> ,I � � 1. Anchor Spacing: Install anchors as indicated or per manufacturer's <br /> ; I recommendations. <br /> I <br /> �i. Painting of Base Supports: Refer to painting work sections of these specifications. <br /> � <br /> � <br /> , (97008-040497) 15140-3 <br /> i II <br /> � il <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.