My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6606 STADIUM DR (2)
Zephyrhills
>
Building Department
>
Building Plans
>
6606 STADIUM DR (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 11:05:05 AM
Creation date
5/2/2017 10:57:54 AM
Metadata
Fields
Template:
Building Plans
Street #
6606 STADIUM DR
Location
STADIUM DR
Contractor
RONALD E HUFF
Building Plans - Permit #
DIALYSIS CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> , � <br /> ; � <br /> � � <br /> i �j MECHANICAG SYSTEM INSU�ATION <br /> ,I i i SECTION 152Sq <br /> ,� � � <br /> , � <br /> , I <br /> 3.6 PlPE SLEEVES <br /> i i <br /> A.i Pipe insulation and vapor barrier shall be continuous through sleeves in walls and floors. <br /> i � <br /> � B.i Type B insulation shall not be used in sleeves thraugh fire walls or fire rated (2 hour)floor <br /> ' ' systems. Use Type A through the sleeve instead and vapor seal the joint befinreen the fwo <br /> ; j insulations. <br /> I <br /> � C� Provide 26 gauge galvanized steel or 0.020 inch aluminum jacket over insulation on pipe <br /> � i passing through sleeves where sealant is reguired. See Section '1505Q. <br /> i I � <br /> j D� Where penetrating interior walls,extend the metal jacket 2 inches out either side of the wall <br /> � � I and secure each er►d with a metal band campressing the insulation slightly. <br /> I � � <br /> i II <br /> i E� Where penetrating f�oars, eutend the metal jacket 2 inches below the f]oor and 5 inches <br /> � ;i above the floor. Secure with metal bands. <br /> �� <br /> i 3.7 TYPE F tNSULATION INSTALLATION - <br /> ,� � <br /> I A. Ducfwork lnsulation Application <br /> I ' <br /> � 1. Appty insulation tightly and smoothly ta duct. <br /> I � <br /> � ' 2. Secure insulation on the battom of ducts and plenums and on the sides of plenums <br /> � i and other places where the insulation will sag. <br /> i <br /> � � 3. Impa(e insu(atian over pins or anchors located not more #han 18 inches apart and <br /> i ! i hold in place with washers and clips. <br /> i � � <br /> i i j 4. Cut off protruding pin after clips are secured and seal with aluminum backed pressure <br /> � �� sensifive tape. <br /> � <br /> �� i� 5. Apply insulatian with joints tightly butted. <br /> � � � <br /> , , 6. Seal all ductwork joints, punctures and fittings with a mastic type sealant eontaining a <br /> � i I vapor bar�ier. <br /> i ' <br /> , ; 7. Cover al! breaks,joints, punctures and vaEds with a vapar seal mastic and cover with <br /> � � i a vapor barrier material identical ta vapor barrier on#he insulation. <br /> � II <br /> I i1 <br /> � ; ' 8. Bevel insulation around name plates, access plates and doars. <br /> i <br /> �� i <br /> 1 ; 9. tnsulation shall be confinuaus through walls and fioors except at fire dampers. <br /> i <br /> I <br /> � <br /> i 3.8 i METAL JACKET INSTALLATION <br /> i �� <br /> I �A. Cover alt piping insulation in chiller plant, Building J, with aluminum jacket to 8 feet above <br /> � I finished floor. <br /> � � <br /> �� i <br /> ' � � END OF SECTION <br /> I <br /> � � <br /> i {97008-040497} 15250-9 <br /> � �� � <br /> � - <br /> � � ) <br /> y � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.