Laserfiche WebLink
� ; <br /> I I PLUMBING <br /> I � SECTION 15400 <br /> i ! � <br /> 'i il . <br /> � C., Codes and Standards: The following codes and standards appiy to all or part of the <br /> ' ' i products or procedures covered in this specification. Individual items of the specification <br /> 'I ; � may refer more specifically to applicable sections of these codes or standards. <br /> � i � 1. All local codes and regulations. <br /> ; ; i 2. Cast Iron Soil Pipe Institute(CISPI). <br /> � ; j 3. Copper Development Association, Inc. <br /> ' 4. Manufacturers Standard Society(MSS)SP-69. <br /> � ' I 5. Plumbing and Drainage Institute (PDI). <br /> � ;i 6. Standard Plumbing Code, 1994 Edition. ' <br /> � 7. Underwriters Laboratories (UL). �' <br /> . i ' � 8. State of Florida Energy Efficiency Code for Building Construction, 1993. ', <br /> ; I � 9. Standards for Facility Accessiblity by the Physically Handicapped. ' <br /> � � i I <br /> � 1.5 SUBMITTALS <br /> li i <br /> i. Submit six complete copies of manufacturer's specifications, data sheets and installation <br /> instructions for domestic hot and cold water, soil and vent and storm piping materials, <br /> � including all piping support systems, PVC jointing material (glue), insulation, valves, <br /> I plumbing fixtures, trim, plumbing equipment products specified herein and on the - ', <br /> � Contract Documents, including corresponding plumbing fixture "P" number and ' <br /> imanufacturer name on each sheet as specified. Submittals shall be in a loose-leaf <br /> � 3-ring vinyl binder (not stapled). The front cover of the binder shall contain the project <br /> � � name and the Brian Cumming & Associates, Inc.job number from the drawings. Index <br /> ' each section using the format from the Project Specifications. Each product of the <br /> � submittal shall begin with a "Submittal Identification Sheet" (see Section 15010) with a <br /> ! complete list of items in that section.- Failure to follow this procedure shall result in <br /> I i rejection of the submittal by the Engineer. This list shall also contain the following <br /> information: <br />, �� I 1. Model numbers and summary descriptions. <br /> ,� j 2. The number of pages submitted for each item. <br /> I i 3. Space for Engineer's review stamp for each item._ <br /> 4. Names of Project, Contractor, Sub-Contractor and Sup�liers of Equirment. <br /> � i � <br /> il <br /> ' B. The submittal shall be formatted in this manner in order to facilitate timely review by the <br /> � I I Engineer. Engineer shall review submittal data no more than two times. Additional <br /> �I i submittal review time shall be paid by Contractor under the base bid at a minimum rate �� <br /> i of$65.00/hour. I <br /> � , <br /> iC. Each section of the shop drawing submittal shall include a copy of the "Submittal <br /> I I Identification Sheet from Section 15010-Basic Mechanical Requirements. <br /> !D. Shop drawings shall include other data as necessary to show compliance with these ' <br /> � � specifications including installation information and distribute one copy of this , � <br /> � information to physical Installer in the field. ' <br /> � i � <br /> I , i E. Complete submittal shall be assembled by the Installing Contractor not the equipment �i <br /> supply houses and manufacturer's representatives serving this project (i.e. Ferguson, <br /> � Hughes Supply, etc.). The complete Specifications and Contract Drawings shall be <br /> used in assembly of Shop Drawings. <br /> F. Submit complete coordination shop drawings within 60 days of Notice to Proceed and <br /> � prior to fabrication. � <br /> I ' <br /> i (97008-040497) 15400-2 <br /> i <br /> i <br /> i i <br /> � i <br />