Laserfiche WebLink
i <br /> I <br /> � <br /> � <br /> I <br /> C. Notify other trades of any deviations or special conditions ' • <br /> necessary for installation of work. Resolve interferences betw;een <br /> work of various contractors prior to installation. If necessary � <br /> remove and properly reinstall without additional cost to the Oiwner, <br /> work not installed in accordance with specifications and drawuzgs <br /> and without proper coordination. Designer will be the final ; <br /> mediating authority in deviation and conflict disputes arising on <br /> proj ect. ' <br /> I <br /> D. Coordinate mechanical equipment installation with other buil�ing <br /> components. i <br /> 1. Arrange for pipe spaces, chases, slots, and openings in <br /> building structure during progress of construction to allow <br /> for mechanical installations. � <br /> 2. Coordinate installation of required supporting devices and <br /> set sleeves in poured-in-place concrete and other struct-iu�a1 <br /> components, as they are constructed. � <br /> 3. Sequence, coordinate, and integrate installations of I <br /> mechanical materials and equipment for efficient flow of <br /> the Work. Coordinate installation of large equipment • <br /> requiring positioning before closing in building. <br /> 3.2 CUTTING AND PATCFiING <br /> A. Repair or replace routine damage caused by cutting in performance <br /> of contract. , <br /> B. Correct unnecessary damage caused due to installation of <br /> mechanical work. <br /> C. Perform repairs with materials which match existing and inst Il in <br /> accordance with the appropriate section of these specification�s. <br /> 3.3 FLASHING, COUNTERFLASHING,AND SEALING: <br /> � <br /> A. Coordinate flashing, counterflashing, and sealing of ducts, pill�es, <br /> etc., at penetration of roofs and outside walls. � <br /> 3.4 Not used. <br /> 3.5 CONNECTION TO EQUIPMENT: • <br /> ICT 99184 <br /> 15010 - 8 <br />� I <br />