My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> i <br /> � I <br /> � <br /> • I ppm of chlorine as determined by residual chlorine tests at ends of <br /> ; lines. Open and close all valves while the system is being <br /> I chlorinated. <br /> � <br /> ' C. After sterilizin�agent has been applied and left standing for 24 <br /> �, hours, test for residual chlorine at ends of lines. If less than 25 ppm <br /> ' is indicated,repeat sterilizing process. <br /> D. After sterilizing agent has been standing for 24 hours and tests <br /> � show at least 25 ppm of residual chlorine, flush out system until all <br /> � <br /> traces of chemical used are removed. <br /> � <br /> E. Local health department will check and approve system before <br /> � connecting to existing system. <br /> 3.9 Not used. <br /> � �.10 TESTING <br /> I <br /> � A. Test a11 installed equipment and systems and demonstrate proper <br /> � operation. Submit notices of readiness for inspection. Testing not <br /> � � witnessed by Designer will cause testing shall be repeated. <br /> • I B. Correct and retest work found defective when tested. <br /> � C. Make repau�s to pipmg system with new matenals; peeiung, <br /> � doping, or caulking of screwed joints or holes will not be accepted. <br /> � <br /> ID. Test hot and cold domestic water piping system upon completion <br /> , I of rough-in and before connection to fixtures at a hydrostatic <br /> ; pressure of 125 psig for a period of one hour. <br /> E. Test drainage and venting system with necessary openings plugged <br /> to permit system shall be filled with water and subjected to a water <br /> ipressure of 10 ft. head. System to hold water for 30 minutes <br /> � without a water level drop greater than 4" in a 4" standpipe and <br /> without visible leakaae. Test system in sections if minimum head <br /> � can be maintained in each section. The "10 foot head" shall be <br /> minimum pressure at top joint. <br /> � i <br /> F. Conduct air or smoke test if in opinion of Desi�er reasonable <br /> cause exists to suspect leakage or less than quality workmanship. <br /> i G. Not used. <br /> • <br /> ICT 99184 <br /> 15010 - 11 <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.