My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Concealed Fully Recessed: Central Royal Flush GB4, • <br /> white coverplate. <br /> 3. Semi-Recessed: Central GB. <br /> B. Pendent heads in ceilings and horizontal sidewall heads shall have <br /> one-piece, nonadjustable escutcheons. Two-piece or slip <br /> escutcheons shall not be accepted. This does not apply to semi- <br /> recessed heads. <br /> C. Provide one (1) sprinkler cabinet with 12 extra sprinkler heads and <br /> sprinkler wrench for emergency use, or in Building Engineer's <br /> office. <br /> PART 3 - EXECUTION <br /> 3.1 COORDINATION <br /> A. Coordinate installation with other Divisions to insure there are�no <br /> conflicts. Fire protection piping shall not take priority in routing <br /> over HVAC ductwork. <br /> 3.2 PIPE INSTALLATION • <br /> A. Attached hangers to structural steel work by clamping or other <br /> approved methods, except that structural work shall not be drill.ed <br /> and punched. Wherever necessary, furnish, install, and securely <br />' anchor to or between building members suitable angle iron or o�ther <br />' steel members to support sprinkler work. <br /> B. Provide support for grooved piping in conformance with <br /> requirements of MSS-SP-69, "Pipe Hangers and Supports - <br /> Selection and Application". In addition to these requirements, <br /> leave no horizontal pipe unsupported between any two couplin�s <br /> nor shall any pipe be left unsupported whenever a change in � <br /> direction of flow takes place. Provide supports meeting the <br /> requirements stated above,but ensure that the distance between. <br /> supports does not exceed the following: <br /> PIPE SIZE MAXIMUM SPAN <br /> BETWEEN HANGERS <br /> 1 Inch 8 Feet � • <br /> 1-1/4 through 2 Inch 10 Fee t , <br /> ICT 99184 <br /> 15300 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.