Laserfiche WebLink
� � F. Provide unit with the following factory installed optional <br /> components: <br /> 1. Dual pumps . <br /> � 2. Low Level Interlock. <br /> � <br /> � 3. Low Flow Interlock. <br /> I <br /> � 4. High Temperature Interlock. <br /> � <br /> � 5. Automatic Switchover to City Water . <br /> � <br /> 6. Microprocessor Monitor <br /> 7. Optional Operating Conditions: design unit for 100F to <br /> 110F operating conditions. <br /> 2.�3 START-UP &FIRST YEAR'S SERVICE: <br /> � A. Arrange for start-up and first years service. Provide costs for <br /> regular maintenance on a yearly contract basis after the first year to <br /> the Owner at start-up. <br /> 2.4 W�►RRANTY: <br /> �. Provide warraniy for parts and labor for repair for 15 months from date of <br /> startup. � <br /> I <br /> � <br /> PART 3�-EXECUTION <br /> �.1 COORDINATION <br /> A. Coordinate installation with MRI equipment manufacturer. <br /> ' Provide necessary assistance for hookup to MRI equipment. <br /> i <br /> �.2 INSTALLATION <br /> A. Install unit level, rigid, and secured to manufacturer supplied roof <br /> curb. Fina1 installation sha11 be free of leaks both from unit interior <br /> and roof-to-curb interface. <br /> • , i <br /> ICT 99184 <br /> � � SECTION 15765 - 3 <br /> � <br />