Laserfiche WebLink
Equipment room layouts including powerhouse and mechanical • <br /> rooms. <br /> Owner furnished equipment rough-in layouts. <br /> E. If, within 45 days of Notice To Proceed, Contractor fails to �ubmit <br /> a complete list of materials, equipment and accessories in proper <br /> form, Designer reserves right to select a full line of mat�erials, <br /> fixtures, and equipment; which shall be binding upon Contractor <br /> for these materials, fixtures, and equipment as the case may be and <br /> which shall be used in his work. � <br /> 1.15 PROJECT MAINTENANCE MANUALS: <br /> A. Prior to final acceptance of project, furnish to Owner three �ound <br /> maintenance manuals.� These manuals shall include the following <br /> information for each piece of equipment. Clearly indicate �items <br /> provided for this project when other items are shown on the �ame <br /> document. <br /> B. Submittal data including equipment performance data at design <br /> point and over full range (e.g. fan and pump curves with d.esign <br /> point indicated). <br /> C. Operation and maintenance instructions. • <br /> D. List giving names and addresses of vendor, inst lation <br /> subcontractor, and nearest supply house carrying recomm�ended <br /> spare parts. . <br /> 1.16 PROJECT TECHNICAL INSTRUCTION: <br /> A. Prior to final acceptance of project, provide technical instruc i�n to <br /> Owner as follows: <br /> B. Classroom Instruction: Explanation of how systems, inc uding <br /> HVAC, plumbing, and fire protection, are to operate as a ��hole <br />� during each season and during emergencies. <br /> C. Field Demonstration: Provide verbal instruction and demonstrate <br /> operation and routine maintenance for each piece of equipmes�t and <br /> system. <br /> 1.17 PROTECTION OF MATERIALS <br /> � <br /> ICT 99184 <br /> 15010 - 6 ' <br />