My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Dimensional stability(shape deformation and stren�th). • <br /> 2. Containment of the air being conveyed (leakage control). � <br /> 3. Vibration (fatigue and appearance). <br /> 4. Noise (generation, transmission or attenuation). <br /> 5. Exposure (to damage, weather,temperature extremes, <br /> , flexure cycles, wind, corrosive atmospheres, biological <br /> contamination, flow interruption or reversal, underb ound <br /> or other encasement conditions, combustion, or other in- <br /> service conditions). <br /> 6. Support(ali�nment and position retention). <br /> 7. Thermal conductivity(heat gain or loss and condensation <br /> control). <br /> C. Provide duct materials which comply with SMACNA standard and <br /> local and state codes, whichever is the most stringent. <br /> D. Support ductwork in accordance with applicable requirements of • <br /> SMACNA standards, local and state codes, and details on plans, <br /> whichever is the most stringent. <br /> 1.3 SUBMITTALS AND SHOP DR.AWINGS <br /> A. Submit materiallproduct data to desib er for approval ONLY when <br /> it deviates from products specified in PART 2. <br /> B. Shop Drawings: Submit for review complete sheet metal shop <br /> drawings for all duct work, including equipment rooms, shafts, and <br /> especially congested areas and areas with potential conflicts. Do <br /> not proceed without stamped, approved of shop drawings. <br /> Submittal shall reflect space requirements required by other tr�des <br /> such as Electrical, Plumbing, Mechanical and Structural and shall <br /> show that the requirements of a11 trades have been coordinated. <br /> Shop drawings submitted for review shall have stamped appro��a1 <br /> of appropriate trades to substantiate adequate coordination of <br /> space, accessibility and lack of conflict between contractors. <br /> C. General Contractor shall be responsible for coordination betwP�:n <br /> trades and shall stamp and sign the ductwork drawings to • <br /> substantiate that the coordination has been accomplished. <br /> ICT 99184 <br />, 15890 - 2 <br />�` <br />
The URL can be used to link to this page
Your browser does not support the video tag.