Laserfiche WebLink
J <br /> , ry . <br /> � <br /> � <br /> � � � . - <br /> � � Survey the exact comer location again. Run a string line from both directions, then - <br /> � <br /> check the�ntersection with a builder's square or by the 3-4-5 triangie method.�Chalk line <br /> � comer location on the leveling pad. � <br /> ��, 4 Instail the corner block first, whichever corner construction methodhas been selected. � <br /> Install the immediately adjacent face blocks in either direction. Then proceed "with wall <br /> �' installatio�n as per sections 4.4 -4.8. <br /> � ' . <br /> Any corn r unit that does not engage both alignment plugs shall be placed and held in <br /> � position with an appropriate concrete aclhesive. . <br /> � w are eneral rocedures to obtain a quality installation when erecting , <br /> Presented belo� � g p <br /> right angle cor ers: <br /> � � <br />� 5.2.1 Inside CIorners <br /> GravityStone M�11ti/Single-Cell Unit and geosynthetic installation are shown in figure 5.2.1.a. <br /> � ' _ <br /> � <br /> � , � <br /> � ; -,- �— , <br /> � -- _- _-- -- _ - . . .^ - <br /> � `•--- - • _ ._.__.._ <br /> ���� riocr couase <br /> � µIERNAIE REINFIXiCEMENT Wd <br /> E%fEPIDON IXu SUBSE9UEM <br /> — �Q SPECFiEDfiEWF0�7CEMEM <br /> yl ELEvanOra <br /> � S�� �2�� SGECEIEDREPffORCEbENT - <br /> ��� � <br /> � EIEVADON <br /> , ��a <br /> � ._._.__..... .. <br /> � <br /> r�a Ex1EEni5iON ' r�OfES: <br /> E% <br /> 9EVClVD WA�L AUERN4TE FtACE�vEM CF <br /> :� T__ RENFORCEtiEM EXiEKSqN <br /> ON SiEC1FIED REINfCRCEI�EM <br /> _ ELEVAiIOt�b. <br /> ' - ..,.— Figure 5.2.1.a:Inside Corners for <br /> � —�r-- Gravity Multi/Single-Cell Units with <br /> Geosynthetic Reinforcemerit <br /> 561UAl7ED . <br /> CCRNER ' <br /> � , - . <br /> \ I <br /> � Gra�it Stone Fat Face Unit and geosynthetic installation are shown in Figure 5.2.1.b - <br /> Y <br /> � <br /> � � <br /> � <br /> - I _ . ._ . <br />