<br /> 1. Revise lighting and power& systems in 1-174 as indicated on Sheet E-6, dated May 10, �
<br /> 2001, Delta No. 1. � �� i
<br /> ' I
<br /> i
<br /> Sheet E-7—Lighting 2nd Floor Plan Phase 2A � (
<br /> �
<br /> �
<br /> ; i
<br /> 1. Relocate panel NLD2 and revise lighting for new wiring room as indicated on Sheet E-7,
<br /> dated May 10, 2001, Delta No. 1. i
<br /> � �
<br /> Sheet E-8 —Power& Systems - 2°d Floor Plan Phase 2a ' i, i
<br /> ' , ;; i
<br /> 1. Relocate panel NLD2 and add receptacles for n Iw wiring room as indicated on Sheet E-8, '
<br /> dated May 10, 2001, Delta No. 1. ; I i
<br /> i _
<br /> 2. Add new transformer T-UPS and enclosed breaker in existing electric room as indicated on ,
<br /> Sheet E-8, dated May 10, 2001, Delta No. 1. i � ; �i
<br /> 3. Add new UPS panel in 2-112 as indicated on Sheet E-8, dated May 10, 2001, Delta No. 1. �
<br /> ;�
<br /> � �i
<br /> Sheet E-9—Electrical Penthouse/Powerhouse Plan ' �'
<br /> �
<br /> 1. Delete vacuum pump and air compressor as indicated on Sheet E-9, dated May 10,2001,
<br /> Delta No. 1. � j
<br /> 2. Add fire alarm devices in penthouse as indicated on Sheet E-9, dated May 10, 2001, Delta I
<br /> No. 1. ' i
<br /> 3. Add exhaust fan connection for EF-4 as indicated on Sheet E-9, dated May 10, 2001, Delta
<br /> . ;
<br /> No. 1. �
<br /> �
<br /> �
<br /> Sheet E-12—Electrical One Line Diagram ' �, I
<br /> �
<br /> 1. Revise breaker type and adjustments indicated in notes 9 and 24 to match submitted breakers i�
<br /> as indicated on Sheet E-12, dated May 10, 2001, Delta No. 1. �;
<br /> 2. Add owner fiirnished.UPS connections as indicated on Sheet E-12, dated May 10, 2001, �
<br /> i
<br /> Delta No. 1. - '
<br /> i
<br /> Sheet E-13 —Electrical Panel Schedules I ' �i
<br /> �
<br /> i LD1 as indicated on Sheet E-13 '' I
<br /> l. Revise panel schedules DIAGDP, ECDIAG, ECDA, and EC ,
<br /> dated May 10, 2001, Delta No. 1. '
<br /> �
<br /> Sheet E-14—Electrical Panel Schedules ' '
<br /> , j
<br /> 1. Revise panel schedules EQDIAG,EQDL, and NHDl as indicated on Sheet E-14, dated May �
<br /> 10, 2001,Delta No. 1. �