Laserfiche WebLink
RTICLE 8. - GENERAL RESPONSIBILITIES OF THE OWNER: <br /> 8.1 The Owner shall permit the Contractor to use, at no extra cost, existing utilities such as <br /> light, heat, power, and water necessary for the proper execution and completion of the <br /> work. <br /> 8.2 The Owner and occupants shall cooperate with the Contractor to facilitate the perfor- <br /> mance of the work and are responsible for the removal or protection of rugs, furniture, <br /> and clothing, if necessary. <br /> 8.3 The Owner and occupanYs shall be responsible for the proper use and care of the <br /> property including all equipment and appliances. , <br /> 8.4 The Owner shall provide the Contractor with access to the property during normal <br /> working hours on normal working days. <br /> ,RTICLE 9. - GENERAL RESPONSIBILITIES OF THE COMMUNITY DEVELOPMENT DIVISION: <br /> 9.1 The Community Development Division shall provide general administration of the <br /> contract, but it is understood by all parties that the County is not a party to this Contract. <br /> , 9.2 The Community Development Division shall make frequent inspections of the work while <br /> it is in progress to determine if it is proceeding in accordance with the contract docu- <br /> ments. <br /> 9.3 The Community Development Division shall have the authority to reject work which does <br /> not conform to the contract documents. <br /> �RTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal,, the Work <br /> Write-U , including any drawings or plans, the General Bid Specifications, and any insurance policies specified <br /> in Articl 5 above. <br /> RTICLE 11. - CHANGES IN THE WORK: Except in an emergency endangering life or property, no <br /> change in the work shall be made by the Contractor unless he has received a prior written order signed by the <br /> Owner nd�authorized representatives of the Community Development Division. The contract sum and the <br /> contrac time may be changed only by Change Order. No extra costs will be paid to the Contractor when he <br /> has ne lected to properly evaluate the extent of the construction work. Change orders need to be in line with _ <br /> bidding amounts or pricing. <br /> ARTICLE 12. - GUARANTEES AND WARRANTIES: The Contractor shall guarantee to correct any <br /> work th t fails to conform to the contract documents and shall correct such defects due to faulty materials, <br /> equipm nt, or workmanship which appear during the progress of the work or within a period of one year from = <br /> the dat of final inspection and acceptance or such longer periods of time as may be specified by law or by <br /> terms any special guarantees required by the contract documents. The provisions of this Article apply to <br /> work d ne by subcontractors as well as, work done by the Contractor. Furthermore, the Contractor shall <br /> furnish'the Owner, in care of the Comrriunity Development Division, with all manufacturers' and suppliers' <br /> written guarantees and warranties covering materials and equipment furnished under the contract. These <br /> docum nts are to be neatly organized and bound in a file type folder and submitted with Yhe final pay request. - <br /> If a wa ranty item malfunctions or breaks, the Contractor shall contact the Owner within 24 hours to schedule <br /> the rep ir or replacement of the item. The warranty item should be repaired or replaced within.seven (7) days. <br /> S/Commu ity DevelopmenUHousing Forms Revised 04/27/11 <br /> - 4- <br />