Laserfiche WebLink
INSTALLATION INSTRUCTIONS I�747M <br />' F�r�L�ck° Zo�� C�n��ol ise� �dul� �ser�bly <br /> SERIES 747M <br /> �EXAMPLES OF ALTERNATIVE WAYS TO MAKE THE THREADED DRAIN CONNECTION <br /> �he following drawings provide examples of alternative ways to make the threaded drain connection to avoid interference with couplings on the water <br /> 'supply side and sprinkler distribution side of the module body.NOTE:These graphics show the Series 747M installed with the optional pressure relief <br /> �alve kit. <br /> i <br /> �4 � � � <br /> "n@I e91 <br /> o a o o '' a <br /> 1 1 � 1 1' <br /> 1 1 1� 1' <br /> I � Jb ,-.,.... I I I �e �i=+i ,b - I I <br /> a ��,I_I � �; o o �� I_I I� o <br /> ��� `\ �., ���-�p -\. <br /> _ ��o�' �j� � � ��,' r� $ <br /> ��� � ./� ��-' ���; ./ <br /> `F, - _—'—F=- '"._=��. <br /> When installing a street elbow directly into the drain port,the street elbow must be threaded into the drain port <br /> before the Series 747M is installed into the system with grooved pipe and grooved pipe couplings. <br />, -- ' � <br /> �dll <br /> O r" Q <br /> i I I { 1 <br />�I I I � ^b, m I I <br /> I�� , <br /> o- I�`I_I I .., o <br /> � <br />� � i� �_ , �O � a ��\:. <br /> _�a / t <br />', k�� .'�+ -_-�=i <br />' If the Series 747M was installed in the system before the connection to the drain port was made, <br /> install a close nipple and a straight coupling before installing the street elbow. <br />'i SYSTEM FLOW TEST 2. For 1'/a-2-inch/42.4-60.3-mm modules:Turn the thumb screw <br /> I on the handle of the"Test/Drain Valve"counterclockwise.Place <br /> � �AR��f��jG the handle of the'Test/Drain Valve"in the"TesY'position. <br /> • DO NOT operate the"Test/Drain Valve"under pressure. 2a. For 21/z-6-inchl73.0- 168.3-mm modules:Lift the handle of the <br />�I Make sure the°Shutoff Valve" is in the°Closed" "Test/Drain Valve"up and rotate it to the"TesY'position. <br /> position before operating the°Test/Drein Valve:' 3. Place the"Shutoff Valve"in the"Open"position. <br /> Failure to follow these instructions could result in serious 4- Verify that the water-flow detector is operating properly and that <br /> personal injury and property damage. the alarms have sounded. <br /> 5. When the system flow test is complete,place the"Shutoff"valve in <br /> Notify the authority having jurisdiction,remote station alarm monitors, the"Closed"position. <br />�� and anyone in the affected area that the system flow test is being 6. For 1'/a-2-inch/42.4-60.3-mm modules:Place the handle of <br /> conducted. the"Test/Drain Valve"in the"Drain"position.Hand-tighten the <br /> 1. Before performing the system flow test,confirm that all valves are thumb screw. <br /> in their normal operating positions("Shutoff Valve"in"Closed" 6a. For 21/z-6-inch/73.0- 168.3-mm modules:Lift the handle of the <br /> position and "Test/Drain Valve"in"Drain"position). "Test/Drain Valve"up and rotate it to the"Drain"position. <br /> www.victaulic.com <br /> VICTAULIC IS A REGISTERED TRADEMARK OF VICTAULIC COMPANY.�2010 VICTAULIC COMPANY.ALL RIGHTS RESERVED.PRINTED IN THE USA. �Ct'a�UI1L� <br /> I-747M_2 REV E <br /> I <br />� — <br />