My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17736
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 1:19:20 PM
Creation date
7/18/2017 1:19:20 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR HEIGHTS
Building Department - Doc Type
Permit
Permit #
16-17736
Building Department - Name
SR TRUST
Address
39404 6TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
usan Ritter op.osal#U9U716-U1 -Cioogle llocs rage 1 oi � <br /> Mitchell Roof Systems LLC 09/07/16 <br /> 3015 Whispe�ing LN � <br /> Wesley Chapel,FL 33543 <br /> (813)312-2126 <br /> tmitchell @mitchellroofsvstems.com <br /> State Certified Rooflng Contracbor LIG riCCC1329714 <br />� Proposal <br /> Proposal Submitted TO: <br /> Susan Ritter <br /> 39404 6�'Ave <br /> Zephyrhills,FL 33542 <br /> susa n.ritte r1@�m a il.com <br /> WE HERE BY SUBMIT SPECIFICATIONS AND ESTIMATE FOR: <br /> Low slope re-roof&solar vent Installatlon • <br /> 1. Remove improperly installed roll roofing membrane,underiayment and asphalt shing(es at tie-in. <br /> 2. Nail exposed raof sheathing using 8d ring shanked nails. <br /> 3. Install GAF Liberty SBS self-adhered base.sheet and SB$Cap over properly prepared roof deck.(color: <br /> White) <br /> 4. Install solar powered roof vent on shingie portion of home. <br /> Total $1,700.00 <br /> • All grounds to be cleaned up on a daily basis. All bushes, shrubs, and flowers to be <br /> protected. <br /> *All labor guaranteed 5 full years* <br /> Price includes all labor and specified materials to complete)ob,clean up and disposai of all job relate debris and any permitting <br /> and Inspectfons required. � <br />� Acceptance of Proposal:Terms as follows.Homeownerto supply dumpsterfor job related debris.Balance of$1,700.00 due <br /> upon completlon of above specified work. <br /> Property Owner Datec��� <br /> Contractor � Date <br /> :lps://doc$.google.com/document/d/1RMvejwUQRugqMff9ij2dVGHaNbStbkCTF4Vg114wX84/edit 9/13/2C <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.