Laserfiche WebLink
' <br /> � <br /> C0�lSTRUCTION PLAN R�VIEUJ Ra�?ant Food Store#1204 <br /> � � PR.OV�I�G`��'��}ER�' >_ - .__._ : -- n-- �Fa;�ifiy'�D#;519it�25C;1 �- <br /> Page 3 of 3 June 22, 2016 <br /> � (n addition, a final inspection will be performed upon compietion of all construction. At fhe final <br /> � inspection the facility must be able to confirm registration updates for the closure and <br /> � insta(lation have been submitted to the FDEP's registration section. Additionally, the facility <br /> must demonstrate that the new fark systems have the appropriate 3�d Party Petroleum Liabilify <br /> & Corrective Action coverage <br /> I, , �. �� C� , acting as a representative of Core States Group have <br /> reviewed this ocument with the DOH-Pinellas, Petroleum Storage Tank Compliance Program staff, <br /> and am aware of the specified conditions and notification timeframes <br /> � � �o <br /> � re Stat Group `Dat�eJ ` <br /> I � <br /> � <br /> .loseph Sowers <br /> Environmental Supervisor II <br /> � <br /> ._,% <br /> �'�-=rr���°f�'f E�fL/ <br /> - ,- �-'J'//J <br /> � • . .r- /i�i/� <br /> �`����i.�GG�iG��/;/,G"�`�/'/%�(.� <br />