My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17877
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2017 7:44:37 AM
Creation date
7/20/2017 7:44:36 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
16-17877
Building Department - Name
WEICK,RAYMOND E & RUTH
Address
37647 COREY LEWIS AVE LOT 321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> -� ' . I page 1 <br /> OLNER TECHNOLOGIES,INC. revision 6/07 <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> MODEL 1'101"V"SERIES ALL STEEt FOUNDATION SYSTEM <br /> MODEL 1�01"V"{STEPS 1-15) <br /> LONGITLIDlNAL ONtY.•FOLLOW STEPS 1-9 <br /> � FOR ADO/NG LATERAL ARM:Fo!/ow Steps 10-15 <br /> ' FOR CONCRETE APPLlCA7lONS:Follow Steps 16-99 <br /> I <br /> I ENGINEERS STAMP ENGINEERS STAMP <br /> 1.SPECIAL CIRCUMSTANCES: If the following conditions occur-STOP! Contact Oliver Technologies at 1-800-284-7437: <br /> a)Pier height exceeds 48" b) Length of home exceeds 76'�)Roof eaves exceed 96"d)Sidewall height exceed 96" <br /> e)�tocation is within 1500 feet of coast <br /> INSTALLATION OF GROUND PAN <br /> 2.Remove weeds and debris in an approximate two foot square to expose firm soii for each ground pan(C). <br /> 3.Place ground pan(C)directly below chassis I-beam .Press or drive pan firmiy into soil until flush with or below soil. <br /> SPECIAL NOTE:The longitudinal"V"brace system serves as a pier under the home and should be loaded as any <br /> other pier.It is recommended that after leveling piers,and one-third inch(1/3")before home is lowered completely on <br /> to�piers,complete steps 4 through 9 below then remove jacks. - i <br /> INSTAlLATtON OF LONGITUDINAL"V"BRACE SYSTEM <br /> NOTE: WHEN INSTALLING THE LONGITUDfNAL SYSTEM ONLY, A MiNIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SOIL TEST <br /> PROBE SFFOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFlCATION.IF PROBE TEST READINGS ARE BETWEEN <br /> 175&275 A 5 FOOT ANCHOR MUST BE USED.IF PROBE TEST READINGS ARE BETWEEN 278&350 A 4 FOOT ANCHOR MAY BE U3ED.USE <br /> GR UND ANCHORS WtTH DIAGONAL TiES AND STABILIZER PLATES EVERY 5'4".VERTICAL TIES ARE A�SO REQUIRED ON HOMES SUPPl1ED <br /> ' WITH VERTICAL TIE CONNECTION POINTS(PER FLORIDA RECs). � <br /> 4.Select the correct square tube brace(E)length for set-up(pier)height at support location.(The 18"tube is aiways i <br /> u�ed as the bottom part of the longitudinal arm). Note:Either tube can be used by itself,cut and drilled to length as long as a �, <br /> 40 to 45 degree angle is maintained. <br />� <br /> PIER HEIGHT 125"ADJUSTABLE 1.50"ADJUSTABLE <br /> (A Iprox.45 degrees Max.) Tube Length Tube Length <br /> 7 3/4°to 25" 22" 18" <br /> ; 24 3!4"to 32 1/4" 32" 18" <br /> 33"to 41" 44" 18" <br /> , 40"to 48" 54" 18" ' <br /> 5, ll stall(2)of the 1.50"square tubes(E {18"tube})into the"U"bracket(J),insert caRiage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place 1-beam connector(F)loosely on the bottom flange of fhe I-beam. <br /> 7. Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely with bolt and nut. i <br /> 8. Repeat steps 6 through 7 to create the"V"pattern of the square tubes loosely in place.The angle is not to exceed 45 i <br /> �legree and not below 40 degrees. <br /> 9.After all bolts are tightened,secure 1.25"and 1.50"tubes using four(4)1/4"-14 x 3/4"self-tapping screws in pre-drilfed holes. i <br /> � 1NSTALL.ATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM I <br /> THE MOOEL 1101"V"(LONGITUDINAL 8 LATERAL PROTECTION)ELIMINATES TNE NEED FOR MOST STABILIZER PLATES 8 FRAME TIES. <br /> i NOTE:THE USE OF THIS SYSTEM REQUIRES VER7ICAL TIES SPACED AT 5'4". ; <br /> � FOUR FOOT(4')GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANI3FACTURER SPECIFIES DIFFERENT. � <br /> 10.IrstaU remaining vertical tie-down straps and 4'ground anchors per home manufacturer's instructions.NOTE:Centerline i <br /> anchors to be sized according to soil torque condition.Any manufacturer's specifications for sidewall anchor loads in excess of <br /> 4�,000 Ibs.require a 5'anchor per Florida Code. <br /> 11.No7E:Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location.This frame tie& <br /> stabilizer plate needs to be located within 18"from of center ground pan. ; <br /> 12.Select the correct square tube brace(H)length for set-up lateral transverse at support location.The lengths come in either 60" <br /> oF 72°lengths.(With the 1.50"tube as the bottom tube,and the 1.25"tube as the inserted tube_) ', <br /> 13.I�stall the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. � <br /> 14.Slide�.25"transverse brace into the 1.50"brace and attach to adjacent 1-beam connector( I)with bolt and nut. ; <br /> 15 Secure 1.50"transverse arm to 1.25"transverse arm usinq four(4)1/4"-'14 x 3/4"self-tapainq screws in pre-drilled holes. � <br /> — ,� � <br /> OLIVER TECHNOLOGIES,INC. Telephone:931-796-0555 <br />' 1-800-284-7437 Fax:931-796-88i1 , <br /> www.ofrveAechnologies.cam I <br /> �/ <br />� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.