Laserfiche WebLink
I <br /> � I <br /> i <br /> FORM R405-2014 <br /> TABLE 402.4.1.1 <br /> I <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> i <br /> Project Name: Hayden 4EHB Elev G Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills, FL, Permit Number. <br /> Owner: Jurisdiction: <br /> �Design Location: FL,Tampa <br /> CIOMPONENT CRITERIA CHECK <br /> Ai� barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. <br /> Exterior thermal envelope contains a continuous barrier. <br /> Breaks or joints in the air barrier shall be sealed. <br /> Air-permeable insulation shall not be used as a sealing material. <br /> Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the <br /> insulation and any gaps in the air barrier shall be sealed. <br /> Access openings,drop down stairs or knee wall doors to unconditioned <br /> attic spaces shall be sealed. <br /> Corners and headers shall be insulated and the junction of the foundation <br /> W Ils and sill plate shall be sealed. <br /> The junction of the top plate and the top or exterior walis shall be sealed. <br /> Exterior thermal envelope insulation for framed walis shall be installed in <br /> substantial contact and continuous alignment with the air barrier. <br /> Knee walis shall be sealed. <br /> Wi�dows, skylights and doors The space between window/doorjambs and framing and skylights and <br /> framing shall be sealed. <br /> Rirti 'oists Rim joists are insulated and include an air barrier. <br /> Flo�ors (including above-garage Insulation shall be installed to maintain permanent contact with underside <br /> an i cantilevered floors) of subfloor decking. <br /> The air barrier shall be installed at any exposed edge of insulation. <br /> Cr �WI space walls Where provided in lieu of floor insulation, insulation shall be permanently <br /> attached to the crawlspace walls. <br /> Exposed earth in unvented crawl spaces shall be covered with a Class I <br /> vapor retarder with overlapping joints taped. <br /> Sh �Ifts, penetrations Duct shafts, utility penetrations,and flue shaft openings to exterior or <br /> unconditioned space shall be sealed. <br /> Nar�ow cavities Batts in narrow cavities shall be cut to fit,or narrow cavities shall be filled <br /> by insulation that on installation readily conforms to the available cavity <br /> s aces. <br /> Gariage separation Air sealing shall be provided between the garage and conditioned spaces. <br /> Rec�essed lighting Recessed light fixtures installed in the building thermal envelope shall be <br /> �� air tight, IC rated, and sealed to the drywall. <br /> Plu�� bing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in <br /> � exterior walls,or insulation that on installation readily conforms to available <br /> space shall extend behind piping and wiring. <br /> ShoWer/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air <br /> �� barrier installed separating them from the showers and tubs. <br /> Electrical/phone box on The air barrier shall be installed behind electrical or communication boxes or <br /> air sealed boxes shall be installed. <br /> HVA�C register boots HVAC register boots that penetrate building thermal envelope shall be <br /> II sealed to the sub-floor or drywall. <br /> Fire��lace An air barrier shall be installed on fireplace walls. Fireplaces shall have <br /> � gasketed doors <br /> 10/2812 16 8:38 AM EnergyGauge�USA-FlaRes2014 Section R405.4 1 Compliant Software Page 1 of 1 <br />