Laserfiche WebLink
� <br /> FORI�lI R405-2014 <br /> ' TABLE 402.4.1.1 <br /> AIR BARRIER AND INSULATiON INSPECTION COMPONENT CRITERIA <br /> Pr�ject Name: Cali Elevation D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> �i <br /> City,State,Zip: Zephyrhills, FL, Permit Number: <br /> Owner: Jurisdiction: <br /> D i sign Location: FL,Tampa <br /> �� <br /> COMPONENT CRITERIA CHECK <br /> Airl�barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. <br /> I Exterior thermal envelope contains a continuous barrier. <br /> Breaks or joints in the air barrier shall be sealed. <br /> Air-permeable insulation shall not be used as a sealing material. <br /> Ce ling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the <br /> insulation and any gaps in the air barrier shall be sealed. <br /> Access openings,drop down stairs or knee wall doors to unconditioned <br /> attic spaces shall be sealed. <br /> Corners and headers shall be insulated and the junction of the foundation <br /> Walls and sill plate shall be sealed. <br /> - The junction of the top plate and the top or exterior walls shall be sealed. <br /> Exterior thermal envelope insulation for framed walls shall be installed in <br /> substantial contact and continuous alignment with the air barrier. <br /> Knee walls shall be sealed. <br /> Windows, skylights and doors The space between window/doorjambs and framing and skylights and <br /> IIframing shall be sealed. <br /> Ri�rii 'oists Rim,joists are insulated and include an air barrier. <br /> Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside <br /> an�d cantilevered floors) of subfloor decking. <br /> IIThe air barrier shall be installed at any exposed edge of insulation. <br /> Ciawl space walls Where provided in lieu of floor insulation, insulation shall be permanently <br /> I attached to the crawlspace walls. <br /> Exposed earth in unvented crawl spaces shall be covered with a Class I <br /> Ivapor retarder with overlapping joints taped. <br /> Sh�jafts, penetrations Duct shafts, utility penetrations,and flue shaft openings to exterior or <br /> �I unconditioned space shall be sealed. <br /> Narrow cavities Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled <br /> I by insulation that on installation readily conforms to the available cavity <br /> I s aces. <br /> G�arage separation Air sealing shall be provided between the garage and conditioned spaces. <br /> R�ecessed lighting Recessed light fixtures installed in the building thermal envelope shall be <br /> �� air tight, IC rated,and sealed to the drywall. <br /> i <br /> Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in <br /> exterior walls, or insulation that on installation readily conforms to available <br /> space shall extend behind piping and wiring. <br /> i <br /> Shower/tub on exterlor wall Exterior walls adjacent to showers and tubs shall be insulated and the air <br /> �I barrier installed separating them from the showers and tubs. <br /> E�ectrical/phone box on The air barrier shall be installed behind electrical or communication boxes or <br /> air sealed boxes shall be installed. <br /> � <br /> H AC register boots HVAC register boots that penetrate building thermal envelope shall be <br /> Isealed to the sub-floor or drywall. <br /> F�re lace An air barrier shall be installed on fireplace walls. Fireplaces shall have <br /> �I p gasketed doors <br /> 10/27/2016 4:21 PM EnergyGaugeO USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1 <br /> � <br />