Laserfiche WebLink
- <br /> ` � , <br /> • �I � ' - <br /> - FOR R405-2014 <br /> TABLE 402.4.1.1 <br /> I I AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> � <br /> Proj�ct Name: Cali Elevation D w garage sales office Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City State,Zip: Zephyrhills, FL, Permit Number: <br /> Ow er: Jurisdiction: <br /> Desl gn Location: FL,Tampa <br /> I <br /> CO PONENT CRITERIA CHECK <br /> Air b� rrier and thermal barrier A continuous air barrier shall be installed in the building envelope. <br /> Exterior thermal envelope contains a continuous barrier. <br /> � Breaks or joints in the air barrier shall be sealed. <br /> Air-permeable insulation shall not be used as a sealing material. <br /> Ceill�g/attiC The air barrier in any dropped ceiling/soffit shall be aligned with the <br /> insulation and any gaps in the air barrier shall be sealed. <br /> Access openings,drop down stairs or knee wall doors to unconditioned <br /> attic spaces shall be sealed. <br /> Corners and headers shall be insulated and the junction of the foundation <br /> Wall and sill plate shall be sealed. <br /> The junction of the top plate and the top or exterior walls shall be sealed. <br /> Exterior thermal envelope insulation for framed walls shall be installed in <br /> substantial contact and continuous alignment with the air barrier. <br /> Knee walls shall be sealed. <br /> Windi ws, skylights and doors The space between window/doorjambs and framing and skylights and <br /> framing shall be sealed. <br /> Rim '��ists Rim joists are insulated and include an air barrier. <br /> Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside <br /> and c I ntilevered floors) of subfloor decking. <br /> The air barrier shall be installed at any exposed edge of insulation. <br /> i <br /> Crawl space walls Where provided in lieu of floor insulation,insulation shall be permanently <br /> attached to the crawlspace walls. <br /> Exposed earth in unvented crawl spaces shall be covered with a Class I <br /> vapor retarder with overlapping joints taped. <br /> Shafti, penetrations Duct shafts, utility penetrations,and flue shaft openings to exterior or <br /> unconditioned space shall be sealed. <br /> Narro Cavltie5 Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled <br /> by insulation that on installation readily conforms to the available cavity <br /> s aces. <br /> Gara�e separation Air sealing shall be provided between the garage and conditioned spaces. <br /> Rece�sed lighting _ Recessed light fixtures installed in the building thermal envelope shall be <br /> � air tight, IC rated,and sealed to the drywall. <br /> Plum �ing and wiring Batt insulation shall be cut neatly to.fit around wiring and plumbing in <br /> exterior walls,or insulation that on installation readily conforms to available <br /> . space shall extend behind piping and wiring. <br /> Showl r/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air <br /> � barrier installed separating them from the showers and tubs. <br /> Electrlcal/phone box on The air barrier shall be installed behind electrical or communication boxes or <br />�I <br /> air sealed boxes shall be installed. <br /> HVACI register boots HVAC register boots that penetrate building thermal envelope shall be <br /> sealed to the sub-floor or drywall. <br /> � An air barrier shall be installed on fire lace walls. Fire laces shall fiave - <br /> Firepl ce P P <br /> � gasketed doors <br /> 10/18/201� 4:14 PM EnergyGaugeC�USA-FlaRes2014 Section R405.4 1 Compfiant Software Page 1 of 1 <br />