Laserfiche WebLink
i � � <br /> I <br /> � <br /> ; ���NCO CONSTIZ�JCTION �' <br /> PROP�S1�iI� � �i <br /> biancobuilding.com j; <br /> Find and like us on facebook at htQ�://vv�vw.Faceboml:.com/�iaaaco�onstrucgeon�,' <br /> i <br /> i° <br /> Nove�ber 7,2016 I; <br /> � � <br /> , <br /> �. <br /> I! <br /> Between 1Vir.and.IVlrs.Peter Abbruzzese ! <br /> b20417�'s�. ;' <br /> Zephg�rhills,Fl <br /> 813-395-5211 ;; <br /> �. <br /> i. <br /> And the Contractor: BIANCO CONSTItUC�YON <br /> CBC060201 �'; <br /> 15147 MYRTLE ST �' <br /> I)AIDE CITY,FY.33523 i <br /> 352-567-9029 �! <br /> , <br /> For the Project: Window Install�tion � <br /> i <br /> Contractor ro oses to furnish all labor as�tecl below for the above m'' tioned Pro'e��. <br /> DESCitIBE�VORK,Ii�IATERIALS OR LABOIt �; AI�OUNT <br /> Remove And Replace 8 Windows I� <br /> VI Wintech Shoreline,Single-Hung 3100 Standard Low-E '' <br /> Replair Stucco,Front Of House �� <br /> Labor And M erials $5300.00 <br /> This proposa!shall be valid for 20 days. t <br /> THIS DOCLJMEN'T IS A PROPOSAI.O:VLY. �i SIGNED CONTRACT IS � UIadED BE�ORE <br /> COMM�NCEMENT O�PItOJECT. 1 <br /> This price does not reflect any hidden structural defects,termite damage,wo, d rot,or other <br /> defective components of the existing house which may need to be repaired o; replaced in order to <br /> properly complete the above-quoted work,and further acknowledge that the xpense,if any,will <br /> be the responsibility ofthe property owner. �' <br /> I` <br /> A Change Opder is any change to the original plans and/or specifications. I. Il change orders <br /> need to be agreed upon m writing,including cost,additional time considerat+ ns,approximate <br /> dates when the work will begin and be completed,a legal description af the�l cation where the <br /> work will be done and signed by both parties. NO extra work will be startedi r special order <br /> items ordered until the extra.work/change order sheet has been signed by all'�arties,contractor, <br /> owner and subcontractor (If applicable)and payment in full for the additiori 1 work to be done or <br /> special order item(s)ordered. '� <br /> ;; <br /> � <br /> Payment Shedule �' <br /> 1/2 before comntencement of project..............s....$2650.00 �: <br /> l�emaining bala�ce due upon completion.............$2650.00 ' <br /> Peter Bianco Construction,Inc, <br /> �he Contractor shall promptly pay all s ms owed to <br /> laborer�,subcontractors,and ffiaterial-�en who supp�y l�bor and/or�� rials for the vaork <br /> and shall andemnify,Inold harmless,and defend the o�vner and the prop on�vhicb the <br /> work is lo�ated from ffiechanic's and anaterial-�►en's liem�. The contrac r v�ll fnrnish a <br /> fin�lien waiver wathin ten days after finai payment received. ' <br /> , <br /> RESPECTFULLY SUBMITTED ; <br /> Signature dba,Peter Bianco onstruction,Inc. <br /> Date: ! <br /> ACCEPTANCE OF PROPOSr1Y,ANID CONTRAGT i' <br /> THE ABOVE PRICES, SPECIFICATIONS,TERMS,AND CONDITIONS' <br /> SATIFACTORY AND ARE HEREBY AC�EPTED. PETER BIANCO C{ STRUCTION, <br /> INC. IS HEREBY AUTRHORIZED TO PERFORM TI�WORK AS SPE��IFIED. <br /> i <br /> �. <br /> Ac d • (: <br /> � � � <br /> ;, <br /> nwner Siunafi�re Date � <br /> ,F _ <br /> I <br /> � <br /> � <br /> � <br />