Laserfiche WebLink
i <br /> � I <br /> _ I' <br /> . • I <br /> i <br /> i � <br /> i i I <br /> 6744 BASSWOOD CR-RYMAN CONSTRUCTION-7577 sqft <br /> il o umn I <br /> II SQ.FEET PRICE <br /> II MAIN OR LIVING: 1,577 <br /> II <br /> OTHER AREA UNDER ROOF: - $ 88.00 <br /> �� I <br /> II OTHER: - $ <br /> �� <br /> II <br /> II VALUATION $ 136,200.00 <br /> �� <br /> II FEE SHEET $ 599.00 <br /> II <br /> II ADDRESS $ 40.00 <br /> �� <br /> �� DRIVEWAY $ 40.00 <br /> II <br /> II BUILDING: $ 690.98 <br /> �j ELECTRICAL: $ 214.43 <br /> �� PLUMBING: $ 89.85 <br /> I'i MECHANICAL: $ 62.90 <br /> II SUB-TOTAL $ 1,058.16 <br /> �� � <br /> �� TOTAL $ 1,058.16 <br /> II I <br /> II SEWER: $ 1,909.50 <br /> II WATER: $ 608.95 <br /> II IRRIGATION: $ - <br /> �� TOTAL: $ 2,518.45 <br /> �� <br /> II WATER METER: MASTER METR <br /> �� IRRIGATION METER $ - <br /> li <br /> II FIRE DEPARTMENT FEES <br /> II PLANS TOTAL: $ 79.42 <br /> IINSPECTION TOTAL: $ 7.50 i <br /> II PERMIT TOTAL <br /> �� TOTAL: $ 86.92 <br /> II <br /> Ii pUBLIC SAFETY IMPACT FEES <br />' I� POLICE $ 254.00 <br /> �� FIRE $ 273.00 <br /> �� 5% $ 26.35 <br />, �I TOTAL: $ 553.35 ' <br /> I <br /> �� SUB-TOTAL $ 4,216.88 <br /> u <br /> II PARK IMPACT FEES $ 769.56 <br /> II <br /> II SIF'S: <br />� �� 100.0% $ - <br /> �� 1.0% $ - <br /> II TOTAL: $ - <br /> II <br /> il T I F'S: $ 3,632.00 25%$908.due at permit pick up with 75%$2724 due before pre meter <br /> �� 99% $ 3,595.68 <br /> �� 1% $ 36.32 <br /> II <br /> II TOTAL: $ 8,618.44 <br />�i <br />