My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-18001
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-18001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 1:16:06 PM
Creation date
7/31/2017 1:16:02 PM
Metadata
Fields
Template:
Building Department
Company Name
WALMART
Building Department - Doc Type
Permit
Permit #
16-18001
Building Department - Name
WALMART
Address
7631 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_� <br /> : <br /> VSR-F <br /> � �o�� VANE TYPE WATERFLOW <br /> � The Symbol ofProfection ALARM SWITCH WITH RETARD <br /> FIG. 1 FIG. 2 <br /> SWITCH TERMINAL <br /> I� CONNECTIONS OPTIONAL iAMPER SWITCH DO NOT LEAVE COVER OFF FOR <br /> EXTENDED PERIOD OF TIME <br /> CLAMPING PLATE <br /> � TERMINAL RETARD A0.IUSTMENT: <br /> TO CHANGE TIME TURN KNOB (EITHER DIRECTION) '� TIGHTEN NUTS <br /> � FOR DESIRED TIME DELAY. USE THE MINIMUM ALTERNATELY TO AN <br /> ��� AMOUNT OF RETARD NECESSARY TO PftEVENT EVENTUAL 50Ff,-LBS (68 n-m) <br /> � FALSE ALARMS, A B" SETTING IS USUALLY O OF TORQUE <br /> i �� ADEQUATE FOR THIS. FACTORY IS SET TO "B". � <br /> � � <br /> TO INSTALL, DRILL HOLE AS INDICATED: � <br /> .,�G PIPE SIZE HOLE SIZE � <br /> �1v QM:,/ffi3-3 2� to 2 1�2" 1 1/4� +1/8" -1/16" � MOUNT ON PIPE SO <br /> (50mm to 65mm) (33mm t2mm) ARROW ON SADDLE <br /> POINTS IN DIRECTION <br /> CAUTION: 3- ta $- z- f��8- '� OF WATERFLOW <br /> An uninsulated section of a (80mm to Omm) 50mm t2mm) � <br /> ROLL PADDLE IN <br /> single conductor should not OPPOSITE DIRECTION <br /> be looped around the termi- Cover Tamper OF WATERFLOW <br /> nal and serve as two sepa- (with cover in place) <br /> rate connections. The wire ��I /�T DIRECTION OF <br /> must be severed, thereby � h WATERFLOW I <br /> CG <br /> providing supeNision of the C Np NC \` APPROX. RETARD SETTINGS (IN SECS,) <br /> connection in the event that c"'"r� �R�o� �e�"� � <br /> ���� 0 A B C D E <br /> the�wire becomes dislodged DWG. �761-30 0 10-25 20-40 35-55 50-70 60-90 <br /> from under the terminal. <br /> i <br /> FIG. 3 TYPICAL ELECTRICAL CONNECTIONS rvoTEs: FIG. 4 <br /> 1. The Model VSR-F has two To remove knockouts: Place <br /> � switches, one can be used to screwdriver at edge of knock- <br /> i ,�rs� operate a central station, pro- outs, not in the center. <br /> YeATCRROe'IOME <br /> c�n"sc a��ua o„�,,,,�, �P,`�" prietary or remote signaling <br /> m`" unit,while the other contact is <br /> used to operate a local audible <br /> ; � p a � � c or visual annunciator <br /> I � 2. A condition of LPC Approval of <br /> �pt,�� this product is that the electri- <br /> T������ °p MOiC � cal entry must be sealed to <br /> ox n�c sxrta�a[voa <br /> IW NIY�CaA7TtlN. NEGTIVE OC <br /> *„�^����o a+Ncmau..c exclude moisture. e <br /> I o.ic�»,-� <br /> '�`"�"`"�P�°"" 3. For supervised circuits see �' �e <br /> "Switch Terminal Connec- � <br /> tions" drawing and caution owc.a�e,-< <br /> i note(Fig. 1). i <br /> APPLICATION WARNING! <br /> Due to the possibility of unintended discharges caused by pressure surges,trapped air,or short retard times,waterflow switches <br /> that�are monitoring wet pipe sprinkler systems should not be used as the sole initiating device to discharge AFFF, deluge, or <br /> chemical suppression systems. <br /> TESTING <br /> The�frequency of inspection and testing for the model VSR-F and its associated protective monitoring system should be in , <br /> accordance with applicable NFPA Codes and Standards and/or the authority having jurisdiction (manufacturer recommends <br /> quarterly or more frequently). <br /> If provided,the inspector's test valve, that is usually located at the end of the most remote branch line, should always be used for <br /> testl purposes. If there are no provisions for testing the operation of the flow detection device on the system, application of the <br /> VSR-F is not recommended or advisable. <br /> i i. . <br />� A minimum flow of 10 gpm (38 Lpm)is required to activate this device. <br /> IMPORTANT NOTICE: Please advise the person responsible for testing of the fire protection system that this system must be <br />, tested in accordance with the testing instructions. <br /> PRINTED IN USA MKT #8800001-REV W PAGE 2 OF 2 <br /> MFG.#5400761-7/02 <br /> ;I <br />
The URL can be used to link to this page
Your browser does not support the video tag.