My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18049
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 11:00:54 AM
Creation date
8/1/2017 11:00:53 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
17-18049
Building Department - Name
DUNE FL LAND I SUB C/O HAWK MANA
Address
36108 CARRIAGE PINE CT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM R405-2014 <br /> • TA�LE 402.4.1.1 <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> I <br /> P�roject Name: Aria Elevation D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> Ci ty,State,Zip: Zephyrhills,FL, Permit Number• <br /> Owner: Jurisdiction: <br /> Diesign Location: FL,Tampa <br /> � <br /> COMPONENT CRITERIA CHECK <br /> Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. <br /> Exterior thermal envelope contains a continuous barrier. <br /> Breaks or joints in the air barrier shall be sealed. <br /> Air-permeable insulation shall not be used as a sealing materiai. <br /> Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the <br /> insulation and any gaps in the air barrier shall be sealed. <br /> Access openings,drop down stairs or knee wall doors to unconditioned <br /> attic spaces shall be sealed. <br /> Corners and headers shall be insulated and the junction of the foundation <br /> Wa Is and sill plate shall be sealed. <br /> The junction of the top plate and the top or exterior walls shall be sealed. <br />, Exterior thermal envelope insulation for framed walls shall be installed in , <br /> substantial contact and continuous alignment with the air barrier. <br />' Knee walls shall be sealed. <br /> Wiidows, skylights and doors The space between window/door jambs and framing and skylights and <br /> framing shall be sealed. <br /> Riml'oists Rim joists are insulated and include an air barrier. <br /> Floo s (including above-garage Insulation shall be installed to maintain permanent contact with underside <br /> and�cantilevered floors) of subfloor decking. � <br /> The air barrier shall be installed at any exposed edge of insulation. <br /> Cra� I space walls Where provided in lieu of floor insulation, insulation shall be permanently � <br /> attached to the crawlspace walis. ' <br /> Exposed earth in unvented crawl spaces shall be covered with a Class I <br /> vapor retarder with overlapping joints taped. <br /> Sha�ts, penetrations Duct shafts, utility penetrations,and flue shaft openings to exterior or ' <br /> I unconditioned space shall be sealed. <br /> Narr�ow Cavities Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled <br /> by insulation that on installation readily conforms to the available cavity <br /> s aces. <br /> Gar3ge separation Air sealing shall be provided between the garage and conditioned spaces. <br /> Rec�ssed lighting Recessed light fixtures installed in the building thermal envelope shall be ; <br /> �� air tight, IC rated, and sealed to the drywall. <br /> Plu �bing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in <br /> � exterior walls,or insulation that on installation readily conforms to available <br /> space shall�extend behind piping and wiring. <br /> Shov�rer/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air ; <br /> � barrier installed separating them from the showers and tubs. <br /> Elec�ncal/phone box on The air barrier shall be installed behind electrical or communication boxes or <br /> � air sealed boxes shall be installed. <br /> � <br /> HVA i register boots HVAC register boots that penetrate building thermal envelope shall be <br /> sealed to the sub-floor or drywall. <br /> Firep�ace An air barrier shall be installed on fireplace walls. Fireplaces shall have ; <br /> gasketed doors <br /> 11/7/201�6 10:42 AM EnergyGaugeC�USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1 '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.