Laserfiche WebLink
Fo��t R�.a�-2a�a. <br /> Florida Department of Business and Professional Regulations ' <br /> . . Residential Whole Buildin Performance and Prescri tive Methads <br /> � <br /> ADDRESS: Permit Number: <br /> � Zephyrhills,FL, <br /> M�RN��ATORY REQUIREMENTS S�e individual code sectians for fuli details. <br /> � 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) <br /> display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy Florida law <br /> jSection 553.9085,Flarida Statues]requ�res the EPL disp(ay card to be included as an addendum to each sales cantract far both preso]d and <br /> nonpresold residential buildings.The EPI.display card contains information indica#ing the energy performance level and efficiencies of components <br /> instailed in a dweiling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects ihe plans <br /> and specifications submitted to demonstrate campliance for the building.A copy of the EPL dispiay card can be€ound in Appendix C. <br /> � R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of <br /> Sectians R442.1 through R4d2.4.4. <br /> Q R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1 1 and R402.4.1.2.The <br /> sealing methads between dissimilar materials shal!allaw for differential expansion and contraction. <br /> • R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in <br /> accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. <br /> Where required by the code official,an approved third party shall inspect all camponents and verify compliance. <br /> • R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air <br /> cEtanges per hour in Glimate Zones 1 and 2,and 3 air changes per haur in C(imate Zanes 3 thraugh 8.Testing shall be conducted with <br /> a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Wheee required by the code official,testing sha�l be conducted by an <br /> approved third party.A written report of the resulCs of the test shall be signed by the party conducting the test and provided to the code <br /> officiaL Testing shall be perfarmed at any time after creation af all penetrations of the building thermal envelope. <br /> During testing. <br /> 1 Eacterior windaws and daars,firep(ace and sfove doors sha!(be clased,buf not sealed,beyond the intended weatherstripping or <br /> other infiltration eontrol measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be clased,but not sealed beyond intended <br /> infiitration cantra!measures; <br /> 3.(nterior doors,if instal(ed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,sha[!be turrred off;and - <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> O R4U2.4.2 Firepiaces. New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air. <br /> O R402.4.3 Fenestration air Ieakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm <br /> per square foot(1.5 L/s/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Vs/m2),when tested according to NFRC 400 or <br /> AAMAtWDMAIGSA 10111.S.2lA440 by an accredited,independent Iaboratary and[isted and labeled by the manufacfurer. <br /> Exception: Site-built windows,skylights and doors. <br /> O R402.4.4 Recessed lighting. Recessed luminaires insta]Eed in the building thermal envelope sha]I be sealed to limit air leakage <br /> between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not <br /> more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed <br /> luminaires shaSl be sealed with a gasket or caulk betwesn the housing and the interiar wa0 or ceiling covering. <br /> 0 R403.1.1 Thermostat provision(Mandatory). At least ane thermostat shall be provided for each separate heating and cooling system. <br /> � R�03.1.3 Heat pump supptementary heat{Mandatory). Heat pumps having supplementar}r electric-resistance heat shall have oontrols <br /> th�t,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. <br /> � R4I032.2 Sealing(Nlandatory}A11 ducts,air handlers,and filter boxes and buildi�g cavities that form#he primary air containment <br /> pa�sageways for air distribution systems shall be considered ducts and plenum ehambers,shall be constructed and sealed in accordance <br /> wit Section C403,2.7.2 of the Cammercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction <br /> or ough-in testing below. <br /> Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section <br /> 553.99,Florida Statutes,or as autharizsd by Fiarida Statutes,to be"substantially leak fres'"by either of the following: <br /> 1. Post-construction test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area <br /> when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.All <br /> register boots shall be taped or otherwise sealed during the test. <br /> 2.' Rough-in test:Total leakage shall be less than or equal to 4 cfm{113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested <br /> � at a pressure differential of 0.1 inches w.g.(25Pa)across the system,including the manufacturer's air handler enclasure.All registers shal(be <br /> taped or othervvise sealed during the test.If the air handler is not installed at the time of the test,total leakage shali be less than or equal to 3 cfm <br /> (85 Umin)per 100 square feet(9.29 m2)of conditioned floor area. ` <br /> Exceptions: <br /> 1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope. <br /> 2. Duct testing is not mandatory for buildings complying by Section R405 of this cade. <br /> 1117I2016 i 0:58 AM EnergyGauget7 USA-FlaRes2014 -Section R4d5.4.1 Com Page 1 of 3 <br />