Laserfiche WebLink
S - <br /> r <br /> PGT Industries,Inc. <br /> NOTICE OF ACCEPTAN�E: EV�DEI�TCE SUBMI�'TEl� <br /> A. DRAWINGS <br /> 1. Manufacturer's die drawings and sections. <br /> (Submitterl itn�'er NOA No. 10-08X9.D.� <br /> 2. Drawing No. 6300JR, titled "Impact-Resistant Aluminum Tube Mullions", sheets � <br /> through 2S of 25, dated OS/29/11, with revision B dated 10/10/14, prepared by <br /> manufacturer, signed and sealed by Anthony Lyxiz�1Vliller,P.E. <br /> B. TESTS <br /> 1. Test reports on: 1)Air Infiltration Test, per�BC,TAS 202-9� <br /> 2)Unifarm S�atic Air Pressure Test,Loading per FBC,TAS 202-94 <br /> 3) Water Resistance Test,per FBC,TAS 202-94 <br /> 4) Large Missile Impact Test per FBC,TAS 201-94 <br /> 5) Cyclic Wind Pxessu�te Loading per FBC, TAS 203-94 <br /> 6)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94 <br /> a�ong with marked-up drawings and installation diagram of clipped aluminum <br /> mullions, prepared by Fenestration Testin.g Lab, Inc., Test Report No, FTL-6443 <br /> {samples A-1 thru E-1), dated 02/28/11, and addenduin letter dated OS/OS/1 i, signed <br /> and sealed by Mai•lin D. Bziz�son, P,E, <br /> (S'ubmittert ur:der NOA 1Vo. 1 D-08�9.05} <br /> C. CALCULATIONS <br /> l.. Anchor verification calculations and structural analysis, complying with FBC-2010 <br /> and with FBC Sth �dition (20J�4), prepared by mamifacturer, dated 01/29/15, signed <br /> and sealed by Anthony Lynn Miller,P.E. <br /> D. QUALITY ASSUR.A,NCE <br /> 1. Miami-Dade Department of Regulatory 1nd Economic Resources (RER). <br /> E. MATERIAL CERTIFICATIOI�IS <br /> 1. None. <br /> � <br /> Manue e ez,P.E. <br /> Product Cont ol aminer <br /> N�A�To. 6-0218.03 <br /> �xpiration Date: May 26,2021 <br /> Approva!Date: April 14 201b <br /> E-1 <br />