My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18098
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 11:44:56 AM
Creation date
8/1/2017 11:44:54 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
17-18098
Building Department - Name
KARTES,LINDA
Address
37220 NEUKOM AVE LOT 293
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ ' . <br /> - page l <br /> OLNER TECHNOLOGIES,INC. revision 6/07 <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> � MODE�1�01"V"SERIES ALL STEEL FOUNDATION SYSTEM <br /> MODEL 1101"V"(STEPS 1-15) <br /> LONGITUDlNAL OIYLY.•FOLLOW STEPS 1-9 <br />, FOR ADDING LATERAL ARM:Follow Steps l0-15 <br /> FOR CONCRETE APPL1CA770NS:Follow Steps l6-99 <br /> ENGINEERS STAMP ENGINEERS STAMP <br /> 1.SRECIAL CIRCUMSTANCES: If the following conditions occur-STOP! Contact Oliver Technologies at 1-800-284-7437: <br /> a)�Pier height exceeds 48" b) Length of home exceeds 76'c)Roof eaves exceed 16"d)Sidewall height exceed 96" <br /> e)�ocation is within 1500 feet of coast <br /> 1NSTALLATION OF GROUND PAN <br /> 2.Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan(C). <br /> 3.Place grourld pan(C]directly below chassis I-beam . Press or drive pan firmly into soil unfil flush with or below soil. <br /> SPECIAL NOTE:The longitudinal"V"brace system serves as a pier under Ihe home and should be loaded as any <br /> other pier.It is recommended that after leveling piers, and one-third inch(1/3")before home is lowered completely on <br /> to piers,complete steps 4 through 9 below then remove jacks. <br /> INSTALLATION OF LONGITUDINAL"V"BRACE SYSTEM <br /> NOTE: WHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SO1L TEST <br /> PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION.IF PROBE TEST READINGS ARE BETWEEN <br /> 175I8 275 A 5 FOOT ANCHOR MUST BE USED.IF PROBE TEST READtNGS ARE BETWEEN 276 8 350 A 4 FOOT ANCHOR MAY BE USED.USE <br /> GROUND ANCHORS WRH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4".VERTICAL TIES ARE AlSO REQUIRED ON HOMES SUPPLIED <br /> � WITH VERTICAL 71E CONNECTION POINTS(PER FLORIDA REG_). <br /> 4.Select the correci square tube brace(E)length for set-up(pier)height at support location.(The 18"tube is always <br /> used as the bottom part of the Iongitudinal arm). Note:Either tube can be used by itself,cut and drilled to length as long as a <br /> 40 i 45 degree angle is maintained. <br /> I <br /> ,PIER HEIGHT 125"ADJUSTABLE 1.50"ADJUS7ABLE <br /> (App'lox.45 degrees Max.) Tube Length Tube Length <br /> ,� 7 3/4"to 25" 22" 18" <br /> I,I 24 3/4"to 32 1/4" 32" 18" <br /> �� 33"to 41" 44" i 8" <br /> �� 40"to 48,. 54° 18" <br /> 5. !n Itall(2)of the 1.50"square tubes(E {18"tube})into the"U"bracket(J),insert carriage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7. Slide the selected 1.25"tube(E)into a 1.50'tube(E)and attach to I-beam connectors(F)and fasten loosely with bolt and nut. <br /> 8. Repeat steps 8 through 7 to create the"V"pattern of the square tubes loosely in place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.After al�bolts are tightened,secure 7.25"and 1.50"tubes using four(4)1/4"-14 x 3/4"self-tapping screws in pre-drilled holes. <br /> INSTALL.ATION OF LATERAL TELESCOPING TRANSVER�E ARM SYSTEM <br />' THE MOOEL 1701'N"(LONGITUDINAL 6 LATERAL PROTECTION)ELIMINATES THE NEED FOR MOST STABtLIZER PLATES 8 FRAME TIES. <br /> NOTE:THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 5'4". <br /> � FOUR FOOT(4')GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFtES DIFFERENT. <br /> 10. Insl Il remaining vertica(tie-down straps and 4'ground anchors per home manufacturer's instructions.NOTe:Centerline <br /> anc�ors to be sized according to soil torque condition.Any manufacturer's specifications for sidewall anchor loads in excess of <br /> 4,000 Ibs.require a 5'anchor per Florida Code. <br /> 11.NOTE:Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location.This frame tie 8� <br /> sta�ilizer plate needs to be located within 18"from of center ground pan. <br />� 12.Sel�ect the correct square tube brace(H)length for set-up lateral transverse at support location.The lengths come in either 60" <br />' or 7�"lengths.(With the 1.50"tube as the bottom tube,and the 1.25"tube as the inserted tube.) <br /> 13.Install the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. <br /> 14.Slide'1.25"transverse brace into the 1.50'brace and attach to adjacent I-beam connector( I)with bolt and nut. <br />' 15.Secure 1_50"transverse arm to 1.25"fransverse arm usina four(4)1/4"-14 x 3/4"self-taaainq screws in are-drilled holes. <br />� I <br /> OLIVER TECHNOLOGIES,INC. Telephone:93'I-796�-0555 <br /> 1-800-284-7437 Fax:931-79s-8811 <br /> j � www.ofrvertechnologfes.com <br /> I � <br /> � �i <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.