Laserfiche WebLink
. l <br /> }. <br /> PGT Industries,Inc. � <br /> NOTICE �F.ACCEPTANCE: EViDENCE SUBMITTED <br /> A. DRAWINGS <br /> 1. Manufacturer's die drawings and sections. <br /> (Submitterl un�ler 1VOA No. 10-0819.0� <br /> 2. Drawing No. 63'OOJR, titled "Impact-Resistant Aluminum Tube Mullions", sheets 1 <br /> . thraugk� 2S of 25, dated �8/29/11, with revision B dated 10/10/14, prepared by <br /> manufacturer, signed and sealed by Anthony Lynn Mil�ex,P.E. <br /> B. TESTB <br /> 1. Test reports on: 1)Air Infiltration Test, per FBC,TAS 202-94 <br /> 2)Unifoim Static Air Pressure Test,Loading per FBC,TAS 202-94 <br /> 3)Water Resistance Test,per FBC,TAS 202-94 <br /> 4)Large Missile Impact Test per FBC,TAS 201-94 <br /> 5) Cyclic Wind Pressure Laading per FBG,TAS 2d3-94 <br /> 6)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94 <br /> along with marked-up drawings and installation diagram of clipped aluminum <br /> mullions, prepared by Fenestration Testing Lab, Iric., Test Report No. I�"TL-6443 <br /> {samples A-1 thru E-1), dated 02/28/11, and addendu�n letter dated OS/OS/13., signed <br /> and sealed by 1Vlarlin D, Bzinson, P,E. <br /> (Stebmitterl utrder NOA 1Vo. 10-0819.05} <br /> C. CALCULATI4NS <br /> 1. Anchor verificafion calculations and structural analysis, complying with FBC-2010 <br /> and with �BC 5th Edition (�0�.4), pxepared by manufaciiuer, dated O1/29/15, signed <br /> and sealed by Anthony Lynn Miller,P.E. <br /> D. QUALITY ASSURANCE <br /> 1. Miami-Dade Deparhnent of Regulatory and Economic Resources (RER). <br />'� E. MATERIAL CERTIFiCATIO1�iS <br /> 1. None. <br /> Manue ez,P.E. <br /> Product Cont ol aminer <br /> NOA No, 6-0218.03 <br /> �xpiration Date: May 26,2021 <br /> Approvai Date:April 14 201b <br /> E-1 <br />