My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
518-02 Revise Res 424 Schedule of Fees re. Zoning, Development and Permitting
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
RESOLUTIONS
>
2002
>
518-02 Revise Res 424 Schedule of Fees re. Zoning, Development and Permitting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2017 8:30:06 AM
Creation date
10/5/2017 8:30:05 AM
Metadata
Fields
Template:
Administration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Mobile Home Permit Fees: The following shall be charged for mobile home <br /> installations: <br /> i. Mobile Home and Park Model Setup-per unit: $ 60.00 <br /> ii. Electrical: $ 40.00 <br /> iii. Plumbing: $ 40.00 <br /> iv. Mechanical: $ 35.00 <br /> 10. Application Fees: $ 15.00 <br /> 11. Plans Checking Fees: When plans are required to be submitted, a plans <br /> review fee shall apply. The plans review fee shall be <br /> equal 1/2 of the building permit fee. The plans review <br /> fee is in addition to the building permit fee. <br /> 12. Reinspection Fees: For each trade: $ 35.00** <br /> i. Wrong Address <br /> ii. Condemned work resulting rom faulty construction <br /> iii. Repairs or corrections not made when inspection called <br /> iv. Work not ready for inspection when called <br /> v. Permit not posted on job site <br /> vi. Plans not at job site <br /> vii. Work not accessible <br /> **When extra inspection trips are necessary due to any of the above reasons, the above <br /> referenced charge shall be made. <br /> 13. Re-Permitting Fees: Whenever a permit has expired, a re-permitting fee of <br /> 1/2 of the original permit fee shall be paid <br /> 14. Time Extension: Per Trade: $ 15.00** <br /> **One (1) 90 day extension will be granted where no progress has been made due to hardship. <br /> 15. Change of Contractor: For Each Division: $ 15.00** <br /> **With letters from parties involved <br /> 16. Refund on Permits: <br /> i. All applications for permit refunds shall be received <br /> within 3 months of permit issuance <br /> ii. Plans examination fees are not refundable <br /> iii. Amount to be retained from permit fee for <br /> administrative processing: $ 25.00 <br /> 17 "After the Fact"Permits: Where construction has commenced prior to the <br /> issuance of required permits, the permit fee shall be <br /> double the normal fee. Any subsequent "after the fact" <br /> permits issued to the same contractor within a 12 <br /> month period shall be triple the normal permit fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.