My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
747-17 Master Resolution for Infrastructure Sales Surtax Revenue Bond (City Hall Project), Series 2017
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
RESOLUTIONS
>
2017
>
747-17 Master Resolution for Infrastructure Sales Surtax Revenue Bond (City Hall Project), Series 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 2:07:54 PM
Creation date
10/24/2017 3:43:26 PM
Metadata
Fields
Template:
Administration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The terms "herein," "hereunder," "hereby," "hereto," "hereof" and any similar terms, shall <br /> refer to this Resolution; the term heretofore shall mean before the date of adoption of this <br /> Resolution;and the term"hereafter"shall mean after the date of adoption of this Resolution. <br /> Words importing the masculine gender include every other gender. <br /> Words importing the singular number include the plural number, and vice versa. <br /> SECTION 1.02 Authority for Resolution. This Resolution is adopted pursuant to <br /> the provisions of the Act. <br /> SECTION 1.03 Resolution to Constitute Contract. In consideration of the <br /> purchase and acceptance of any or all of the Bonds by those who shall hold the same from time <br /> to time, the provisions of the Resolution shall be a part of the contract of the Issuer with the <br /> Holders of the Bonds and shall be deemed to be and shall constitute a contract between the <br /> Issuer and the Holders from time to time of the Bonds. The pledge made in the Resolution and <br /> the provisions, covenants and agreements herein set forth to be performed by or on behalf of <br /> the Issuer shall be for the equal benefit, protection and security of the Holders of any and all of <br /> said Bonds and the Insurers. All of the Bonds, regardless of the time or times of their issuance <br /> or maturity, shall be of equal rank without preference, priority or distinction of any of the <br /> Bonds over any other thereof except as expressly provided in or pursuant to the Resolution. <br /> SECTION 1.04 Findings. It is hereby ascertained, determined and declared: <br /> 1. That the Issuer deems it necessary, desirable and in the best interests of the <br /> Issuer and its citizens and to serve a paramount public purpose that the Initial Project be <br /> constructed, designed,permitted,reconstructed, acquired and equipped. <br /> 2. That all or a portion of the Initial Project shall be financed by and/or reimbursed <br /> from the proceeds of the Series 2017 Bond. <br /> 3. That the purposes for which the Bonds are being issued include the promotion of <br /> the public health,welfare, safety and social benefit to the Issuer and its citizens. <br /> 4. That, as of the date hereof,the Pledged Revenues are not pledged or encumbered <br /> in any manner and are estimated to be sufficient to pay the principal of and interest on the <br /> Series 2017 Bond, as the same become due, and all other payments provided for in this <br /> Resolution. <br /> 5. That the principal of and interest on the Bonds and all other payments provided <br /> for in this Resolution will be payable solely from the Pledged Funds (including such additional <br /> security as may be provided pursuant to Supplemental Resolution); and the ad valorem taxing <br /> power of the Issuer will never be necessary or authorized to pay the principal of and interest on <br /> the Bonds and, except as otherwise provided herein, the Bonds shall not constitute a lien upon <br /> any property of the Issuer. <br /> SECTION 1.05 Authorization of the Initial Project. The Issuer does hereby <br /> authorize the temporary relocation, designing, permitting, acquisition, construction, <br /> reconstruction and/or equipping of the capital improvements which comprise the Initial Project. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.