Laserfiche WebLink
vii. Vacuum breakers or backflow protective devises <br /> Installed subsequent to the installation of the piping, <br /> Or equipment served-one (1) to (5): 3.50 <br /> Over five (5), each 2.50 <br /> 7. Mechanical Permits: Minimum Permit Fee $45.00 <br /> a. For all new construction installations, the fee charged <br /> shall be$45.00,plus $10.00 per ton. <br /> b. Replacements shall be based on contract valuation price. <br /> If no contract price, fee shall then be: <br /> 400 CFM= 1 Ton <br /> 12,000 BTUs= 1 Ton <br /> c. Boilers based on BTU Input: <br /> i. 33,000 BTU (1Bhp)to 165,000 (Bhp) $ 5.00 <br /> ii. 165,001 Btu(5Bhp)to 333,000(Bhp) $10.00 <br /> iii. 330,001 Btu(10 Bhp) to 1,165,000 (Bhp) $15.00 <br /> iv. 1,165,001 Btu(52 Bhp)to 3,300,000(Bhp) $25.00 <br /> v. Over 3,300,000 Btu $35.00 <br /> d. Solar Energy Installation: $45.00 <br /> 8. Mobile Home Permit Fees: The following shall be charged for mobile home installations: <br /> i. Mobile Home and Park Model Setup—per unit $65.00 <br /> ii. Electrical: $45.00 <br /> iii. Plumbing: $45.00 <br /> iv. Mechanical: $45.00 <br /> 9. Application Fees: $15.00 <br /> 10. Plan Checking Fees: When plans are required to be submitted, a plan <br /> review fee shall apply. The plan review fee shall <br /> be equal to one half the building permit fee. The <br /> plan review fee is in addition to the building permit <br /> fee. <br /> 11. Re-inspection Fees: For each trade: $45.00 <br /> i. Incorrect Address: <br /> ii. Condemned work resulting from fault construction <br /> iii. Repairs or corrections not made when inspection called <br /> iv. Work not ready for inspection when called <br /> v. Permit not posted on job site <br /> vi. Plans not at job site <br /> vii. Work not accessible <br /> When extra trips are necessary due to any of the above reasons, the above referenced <br /> charge of$45.00 shall be made. <br /> 12. Re-Permitting Fees: Whenever a permit has expired, a re-permitting fee of Y2 the original <br /> permit fee shall be paid prior to issuance of permit. <br /> 13. Time Extension: Per Trade: $20.00 <br /> One(1) 90-day extension may be granted where no progress has been made due <br /> to a verifiable hardship. <br /> 14. Change of Contractor: For each division: $20.00 <br /> Documentation from the parties involved is required. <br /> 15. Refund on Permits: <br /> i. All applications for permit funds shall be received within 3 <br /> - 3 - <br />