� NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and conVactor may be cited for a misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work,they are advised to contact the Pasco County Building Inspection Divisior�Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTNTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
<br /> use in existing buildings, or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy'or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner',I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner�prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that aIl the infortnation in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other govemment agencies may apply to the intended work, and that it is
<br />' my responsibility to identity what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br />' - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> � - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction,I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fiIl is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application,for Iots less than one(1)
<br /> acre which are elevated by fill,an engineered drainage plan is requireb.
<br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
<br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official Trom thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YO FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMP MENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YOUR LENDE ORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDAJURAT(F.S. .03 � /
<br /> _ _�
<br /> OWNER OR AGE �- ,'r" —- —- CONTRACTOR
<br /> Su s 'bed and s affi e befor�me thi Subscribed and swom t r� beforer�et¢is
<br /> S 4 I by - 'CK t1Q ,s�''Q'L � by 1 ca.( 17�. /�/LL✓L.Q 2
<br /> o is/are p rsonalty own to me or has/have produced W,F p.is/are person�known to me or has/have produced
<br /> � . ' t as identification. (�.Jl�.^Ot�i kJY11/1'!1�GGi1.J+�as identification.
<br /> Notary Public c!/�/L�v� �� Notary Public
<br /> C missionNo. G� �S10�� CommissionNo. 1...�� U� ��J�
<br /> �t t Cu�R�o 1.o sr2�1� � �
<br /> � [Va e orp__f Notary lyped,printed or stamped N e o Not ry typed,pnnted or
<br /> RICS1�60�OIRe�tW
<br /> � Notary Public State ot Florida
<br /> ��Y�b� � � Nataly Lopez
<br /> �p�� �� i My�misslon GG 039904
<br /> �a.�� p�pQ� Expires 10l1812020
<br /> w�
<br /> I�IOY@1T�ber�2Q20 �
<br /> COrt�1 N0.00�158N ���d—.
<br />
|