My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18119
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:21:38 PM
Creation date
12/8/2017 2:21:34 PM
Metadata
Fields
Template:
Building Department
Company Name
OAKSIDE MHP
Building Department - Doc Type
Permit
Permit #
17-18119
Building Department - Name
SNOKE,JEAN & DIETERICH,PATRICIA
Address
6043 AGATE ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' paee I <br /> . • OLIVER TECHNOLOGIES,INC. revirion 6;07 <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> b�lODEL 11�1 "V"SFRIES,4LL TEEL FOLiNDATION SYSTEM <br /> MO�EL 1101"V"(S7EPS 1-15) <br /> LONGITUDINAL ONLY:FOLLOW STEPS 1-9 <br /> FOR ADDIAIG�ATERAL ARM:Follow Steps 10-15 <br /> FOR COMCRETE APPLICATlONS:Follow Steps 1&19 <br /> ENGINEERS STAMP ENGINEERS STAtviP <br /> 'i. SPECIAL CIRCUMSTAMCES: If the following conditions occur- STOP! Contact Oliver Technologies at 1-800-284-7437: <br /> a) Pier height exceeds 48" b) Length of home exceeds 76'c) Roof eaves exceed 16�d}Sidewall height exceed 96" <br /> e) Location is within 1500 feet of coast <br /> �{VSTAL�ATION OF GROURlD P,4N <br /> 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . �i <br /> 3. Place ground pan (C)directly below chassis I-beam . Press or drive.pan firmly into soil until flush with or 6elow soil. � <br /> SPECb4L NOTE: The longitudinal °V" brace system serves as a pier under the home and should be loaded as any ' <br /> other piec It is recommended that after leveling piers, and one-third inch(1/3"} before home is lowered completely on , <br /> to piers, complete steps 4 through 9 below then remo�de jacks. <br /> ItdSTALLATION O� �ONGITIIDIt�fAL"V" i3F�ACE SYSTEM <br /> NOTE: WHEN INSTALLING THE LONGITUDINAL SYSTEM�,�y, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SOIL TEST <br /> PROBE SHOULD BE USED TO DETERMIPIE CORRECT TYPE OF ANCHOR PER SOIL CL4SSIFICAT{ON.IF PROBE TEST READINGS ARE BETWEEN <br /> 175 2i 275 A 5 FOOT ANCHOR MUST BE USED.IF PROBE TEST READINGS ARE BETWEEPI 276�350 A 4 FOOT AIYCHOR MAY BE USED.USC <br /> GROU�ID ANCHQRS WITH DIAGOIVAL TIES AND STABILIZER PLATES EVERY 5'4".VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED <br /> WITH VERTICAL TIE CONNECTION POINTS(PER FLORIDA REG.) . <br />' 4.Select the correct square tube brace (E)length for set- up (pier)height at support location. (The 18"tube is always <br /> used�s the bottom part of fhe longifudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degree angle is maintained. <br /> PIER HEIGHT 1.25"ADJUSTABLE 1.50"ADJUSTABLE <br /> (Approx.45 degrees Max.) Tube Length Tube Length <br /> 7 3/4" to 25" 22" 18" <br /> 24 314" to 32 1/4" 32" 18" <br /> 33"to 41" 4�" 18� <br /> 40" to 48" 54" 18n <br />� 5_ Ins#alt (2)of the 1.50"square tubes(E {18"tube} )into the"U" bracket(J), insert carriage bolt and leaue nut loose for final <br /> adjustment. <br /> 6. Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7. Slide the selected 1.25"tube(E) into a 1.50"tube (E) and attach to I-beam connectors(F)and fasten loosely with bolt and nut. <br /> 8. Repeat steps 6 through 7 to create the"V" pattern of the squaro tubes toosely in place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br />' 9.After all bolts are tightened, secure 1.25"and 1.50"tubes using four(4)1/4"-14 x 3/4"self-tapping screw�s in pre-drilled holes. <br /> INSTA�LLATION OF LATERAL TELESG�PIhG TRA�'SVERSE ARti".SYSTEN; <br /> THE IVIODEL 1101 "V"(LONGITUDINAL�LATERAL PROTECTION)ELIMINATES THE NEED FOR MOST STABILIZEId PLATES 8�FRAME T1ES. <br /> NQTE:THE USE OF THIS SY�TEM REQUIRES VERTICAL TIES SPACED AT 5'4". <br /> FOL1R F�4T(d')GR071h1p ANCHOR MAY 6E USE�EXCFPT WHERE THE HOME MANLIFACTURER SPECEFIES OIFFERENT. <br /> 10. Install remaining vertical tie-down straps and 4'ground anchors per home manufacturer's instructions. PloTE: Centerline <br /> anchors to be sized accordin�to soil torque conditio�.Any manufacturer's specifications for sidewall anchor loads in excess of <br /> 4,006 Ibs. require a�'anchor per Florida Code. <br /> 11. NorE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location.This frame tie & <br /> stabilizer plate needs to be lacated within 18"from of center ground pan. <br /> 12. Select the correct square tube brace (H}length for set-up lateral transverse at support location.The lenqths come in either 60° <br /> or 72"lengths. (With the 1.50"tube as the bottom tube, and the 1.25"tube as the inserted tube.} <br /> 13. Install the 7.50 transverse brace (H)to the ground pan connector(D)with balt and nut. <br /> 14. Slide 125"transverse brace into the 1.50"brace and attach to adjacent I-beam connector( I )with bo�t and nut. <br /> 15. Secure 1.50" transverse arm to 125° transverse ami usina (our(4) 1/4"- 14 x 3/4"self-tao�inq screws in ore-drilfed holes <br /> . , <br /> h OLNER TECliNOL�GIES, tNC. Telephone:931-736�555 <br /> 9-800-284-743� Fax:93'I-7f16-88'f i <br /> www.oliverlech nologies.com <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.