Laserfiche WebLink
��1'� �i'� PRODUCTGUIDE <br /> w r N i�o w s x n o o a s Interior&Exterior poors(1PG013} <br /> .,-���:.,�;��.� ,-, , , �„ fi�, .P�;; .�;�-�-.-�-� <br /> �,=�; �.,, a-�,,. ;�„ " , u <;q,.�z° �,�... " ',Y: �'a"�,s��r� ot:"'�g;. <br /> "�G ' .�';sq,r�! <br /> �r1��.��"�''. ° yA . �, *�� ,��:� � �� � �< , �� <br /> :,.. <br /> �� . '�� �, .�:�, Qy�,:.;, � <:;,.� �:�.�;°��;^;;�„ <br /> ,.. ., � •,,M��,r: nr ..�r:= �..a, nd,�• ;c..,. �"`,,�� 'f <br /> �f�.:.u✓::£�,C..a'��«"��'.b'rv •a. �;";` , .i 5,,. ;�.'. :;`u.....�,�'.z.c sk..a'..es�.;..:.,:.,«,.'.r.�'a,C.:^...43 <br /> •� , • C 0 0 <br /> o Metal hardware offers functionality,aesthetic appeal and resistance ADJUSTMEfVT(SPRIPIG HIiVGES ONLY) <br /> to corrosion but is not totall corrosion roof. `'" " ""` "��"�" �""` <br /> Y p 1. Close door. �.._,-_.,_ ;.__,.__. ...,-____, <br /> --- � <br /> • Plastic hardware offers high resistance to the elements however,over 2. Insert the provided ; � <br /> time it can deteriorate from ultraviolet light,heat,cold,and chemical hex wrench so that Tension <br /> exposure. it can be rotated ' pin <br /> � Brass hardware has a special protedive film to reduce/eliminate clockwise. ; <br /> polishing and requires speciai care. 3. Rotate hex wrench <br /> 1/4 turn and insert Tension � <br /> • See our complete Care and Maintenance document at � hole <br /> www.eld-wen.com/resources for more information on cleanin and tension pin loosely <br /> � 9 into tension hole. � Clockwise , <br /> lubricating hardware. <br /> 4. Remove hex wrench ° <br /> Screw hole repair and hardware alignment,or realignment,are and try closing force. ; � <br /> common tasks for any hardware replacement component.Follow these 5. Repeat steps until i � <br /> instrudions if screw holes become stripped and/or if hardware no closing force is i_ ,_,... �. <br /> longer functions properiy due to misalignment. adequate but do not F��. `� '`"� '� -__._.�.. .,. ., ._._.. _.. <br /> • e o c • rotate past 3 holes on 180°openings or 4 holes on 90°openings. <br /> 1.Cut wooden toothpicks or appropriate sized wood dowel to fit screw e : <br /> hole just below wood surface. For easiest operation,keep the slats in a fully open position while operating. <br /> 2.Fill screw hole with wood glue. <br /> ADJUSTMENTS <br /> 3. Insert toothpicks or dowel;let dry. 1,if the operator comes off of the track,hoid the operator at a sharp <br /> 4.Fill to surface with wood putty;let dry. angle to the glass and reinsert the two legs under the track opening. <br /> 5.Sand smooth and refinish;let dry. 2.Re-couple the operator magnets. <br /> 6.Drill new pilot hole. RE-COUPLE OPERATOR MAGIVETS <br /> • '/ •�� 0 1.Slide the operator past the half-way engagement point until the first <br /> Misali nment can ha en if screws have become stri click. <br /> g pp pped and cannot <br /> be tightened.This alignment will create new screw holes. 2.Full travel blinds will fully engage when you hear the first click.Half <br /> 1.Remove hardware. travel(those units with a single side operation)will require you to <br /> continue moving the operator up until you hear the second click.This <br /> 2.Repair screw holes according to the procedure above. will ensure the magnets are fully engaged. <br /> 3.Mark new screw holes as follows: MECNANISfiA REPLACEMENT � <br /> � Lay hardware in position and hold in place. RAISE&LOWER MECHANISM I <br /> • Mark new screw locations through screw holes. 1.Place a piece of cardboard between the slide mechanism and the , <br /> � Remove hardware and set aside. glass to help release the magnets. �� <br /> 4.Drill pilot holes with 1/16" drill bit at new marked screw hole 2•Tiit the mechanism toward you,and remove the mechanism.It may � <br /> positions no deeper than screw length. require a strong tug to break the magnetic bond. ,I <br /> 5.Install hardware. 3.Before replacing the new slide mechanism,ensure the glass is clean. , <br />, 6.Test operation;if not opereting properly,call us for assistance. 4.Insert the tabs underneath the lip of the inner frame and raise the �i <br /> slide to the top until the magnets engage. I <br /> � � � � a.Full travel blinds will fully engage when you hear the first click. I <br /> REPLACEMENT b.Half travel(those units with a single side operation)will require � <br /> 1.Remove slab. you to continue the travel of the operator up untii you hear the � <br /> 2.Remove hinge plates from slab. second click.This will ensure the magnets are fully engaged. <br /> 3.Repair screw holes as instruded above if stripped. 5.Check for proper operation.Remove and reinstall if necessary. , <br /> 4.Install new hinge plates in the same locations. TILT MECHANISM <br /> 5.Reinstall slab. 1.Move the top helix to the left side.Moving the slider magnet on the <br /> outside of the glass can do this.The helix tilt operator has a magnet <br /> set which will foilow the magnet inside the slide mechanism. , <br /> 2.Clean the glass attaching area. <br /> 3.Peel off the tape on the back of the slider. � <br /> 4.Before application,push the magnet to the left of the slider.Ensure � <br /> the slider is facing the right diredion(there is a long horizontal gap <br /> at the top that aliows the magnet housing to slide along the base), <br /> 5.Let the magnet be attraded to the left side of the magnet,which is <br /> inside the glass.Make sure the slide is horizontal. <br /> 6.Push the slide against the glass firmiy on the tape area,as the <br /> adhesive works under pressure. ' i <br /> 3 RELIABILITY(or real life" � � <br /> �d. <br />