My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18181
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2017 12:54:14 PM
Creation date
12/12/2017 12:53:49 PM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
17-18181
Building Department - Name
CITY OF ZEPHYRHILLS
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- December 2i, 20 i 6 <br /> 190-ft Self-Supporting Tower Structural Analysis Report CCI BU No 826548 <br /> TEP Projecf Number 48i67.104472,Application 372275, Revision 0 Page 5 <br /> 3) ANALYSIS PROCEDURE <br /> Table 4- Documents Provided <br /> _ _ . .. ....... ... . . . _. .. <br /> _ - . - - -. - . _ <br /> Document -_ i - - - - ,RemarKs. �-- - Reference - -Source <br /> _-.: . I .... . ...- . : - <br /> __ ... ._..... _r._. _ ._ .. .. -- ---. ..... _ _ . _. _ _ ... ........- --. .._ _. <br /> Geotechnical Report Nodarse &Associates, Inc. 3497292 CCISites <br /> Tower Foundation Drawing Valmont Microflect 3497291 CCISites <br /> Tower Manufacturer Drawings Valmont Microfiect 3675014 CCISites <br /> Tower Reinforcement Drawings Tower Engineering Professionals 3946359 CCISites <br /> - - - - - - -- - - - - - - - - - - <br /> Post-Modification Inspection Tower Erigineering Professionals 4460699 CCISites <br /> 3.1) Analysis Method <br /> tnxTower (version 7.0.5.1), a commercially available analysis software package, was used to create a <br /> three-dimensional model of the tower and calculate member stresses for various loading cases. <br /> Selected output from the analysis is included in Appendix A. <br /> 3.2) Assumptions <br /> 1) The tower and foundation were built in accordance with the manufacturer's specifications. <br /> 2) The tower and foundation have been maintained in accordance with the manufacturer's <br /> specification. <br /> 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Tables 1 and 2, and "Appendix B-Base Level Drawing". <br /> 4) All tower components are in sufficient condition to carry their full design capacity. <br /> 5) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is <br /> left to the carrier or tower owner to ensure conformance. <br /> 6) All antenna mounts and mounting hardware are structurally sufficient to carry the full design <br /> capacity requirements of appurtenance wind area and weight as provided by the original <br /> manufacturer specifications. It is the carrier's respon'sibility to ensure compliance to the structural <br /> limitations of the existing and/or proposed antenna mounts. l'EP did not perform a site visit to <br /> verify the size, condition or capacity of the antenna mounts and did not analyze antennas <br /> supporting mounts as part of this structural analysis report. <br /> - 7) The following material grades were assumed: <br /> a) Tower legs:ASTM A53-B-46 <br /> b) Tower bracing:ASTM A36 <br /> c) Anchor rods:ASTM A615-75 <br /> This analysis may be affected if any assumptions are not valid or have been made in error. Tower <br /> Engineering Professionals should be notified to determine the effect on the structural integrity of the <br /> tower. <br /> 4) ANALYSIS RESULTS - <br /> Table 5-Section Capacity(Summary) <br /> Section� - i 6omponent � , Cnt�cal - - - ; , j Pass/ ' <br /> EledaUon(tt)_ � � Size � P Iti : �P�,��„ 16_ E /,Ca acd Fa.�l i <br /> No. ; - 1 TYPe � - _ - -_ ; Element; -P - y� <br /> ,-: , - - <br /> � <br /> = = - ° :- _._. . 1 '�.._.._.:; <br /> _. _ . ,. _ : <br /> _ : ` - <br /> Ti 190-1 SO Leg Pipe 2.5 STD 1 -15030.30 53865.90 27.9 Pass <br /> T2 180-160 Leg PIPE 3.5 STD 19 -65368.20 96872.30 67.5 Pass <br /> T3 160-140 Leg Pipe 5 STD 49 -128070.00 157400.00 81.4 Pass <br /> T4 140-120 Leg Pipe 8 STD 75 -198296.00 330771.00 59.9 Pass <br /> — � -- - — <br /> T5 120-113.333 Leg Pipe 8 STD 99 -221326.00 330771.00 66.9 Pass <br /> T6 113.333-106.667 Leg Pipe 8 STD 111 -244626.00 330771.00 74.0 Pass <br /> - _ <br /> T7 106.667-100 Leg Pipe 8 STD 120 -266104.00 330771.00 80.4 Pass <br /> tnxTower Report-version 7.0.5.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.