My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18240
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2017 2:09:19 PM
Creation date
12/12/2017 2:09:18 PM
Metadata
Fields
Template:
Building Department
Company Name
C & R HOLDINGS OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
17-18240
Building Department - Name
C & R HOLDINGS OF ZEPHYRHILLS
Address
5221 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> • ZEPHYRH6LLS F'IRE DEPi4RTMENI' <br /> 38410 6th Ave Zephyrhills, FL 33542 <br /> � FIRE SERVICE USER FEES <br /> Occupancy No.: <br /> Plan No.: Contractor: <br /> Business Name: Billing Address: <br /> Business Address: <br /> Business Phone No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax N6.: <br /> Contact: Contact: <br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE FALSE ALARM FEE <br /> BSite Plan N/C Annual N/C Sprinkler $50 1stAlarm N/C <br /> Multi-Family/Commercfal .06 sf 1st Re-inspection N/C Standpipes $50 2nd Ptlarm N/C <br /> (Minimum Charge$25.00 2nd Re-inspection $100 Fire Pump $50 3rd Alarm N/C <br /> ❑Plan Revisions DBL 3rd Re-inspection ' $250 Hoods $50 4th Alarm $100 <br /> 4th Re-Inspection $500 Fire Alarm $50 5th Alarm $150 <br /> SPRINKLER SYSTEMS (Business closed until �• P Gas 6th Alarm $200 <br /> a0-25 Heads $50 violations corrected) $50 NON COMPLIANCE $150 <br /> 26 plus Heads $100 SPRIfdKLER SYSTEMS Fuel Tanks- Persank $50 <br /> STANDPIPE SYSTEM Hydro Undergrounds $45 Sparklers $100 <br /> �Per Riser $50 Hydrostatic Test $65 <br /> per system Fire Works $500 <br /> FIRE PUMP Acceptance Test $45 Persystem Camp Fire $25 � <br /> � Per Pump $100 Hydrant Flow $75 Controlled Bum $100 <br /> FIRE ALARM SYSTEM ' Hood/Duct $50 • <br /> 0-25 Devices $50 FIRE ALARM SYSTEM Place of Assembly $50 Mnual <br /> 26 plus Devices $100 8 System Acceptance $50 Fire Protection $25 <br /> SUPPRESSION SYSTEMS Reqll Acceptance $50 Flammable Application $50 annua� <br /> Wet $50 OTHER Waste Tire Storage $50 Mnual <br /> ��Y $50 moke Wall $15 perwall Generator<KW $100 <br /> CO2 0 as $25 per tank Generator>30 KW 150 <br /> Other $ � as $25 persystem Bio-Hazard Waste $100 Mnual <br /> KITCHEN EXHAUST Fumigation Tenting $50 <br /> � Hood/Ducts $50 Tent 10'x10'or greater $15 Per tent Torch PoUApplied $50 <br /> OTHER Fire Pump $45 Haz.Materials $100 a�nuai <br /> LP Instailatlon pertank $50 Fire Suppression $30 <br /> , Fuel Tank Installation $50 System Acceptance <br /> ,\ �d $50 � Exhaust Hood/Duct $30 <br /> atura� a ation Re-inspection DBL <br /> r ystem) (other than annual) <br /> �Spray Booth $50 � Inspection scheduled DBL B <br /> and cancelled less than <br /> 24 hours <br /> Construction Insp. N/C <br /> Emergency Vehicle A� $50 FALSE ALARM <br /> PLANS TOTAL� INSPECTION TOTAL��}" PERMIT TOTAL� TOTAL� <br /> ��, <br /> GRAND TOTAL <br /> Comments: <br /> Date: <br /> Inspector: <br /> nm <br />
The URL can be used to link to this page
Your browser does not support the video tag.