Laserfiche WebLink
��-�=��_� ��+ � �1 <br /> �_ <br /> . _ .._..---�._.,� �� ==�.�,__ },v� �, <br /> . �-.. .� �?,,�„-�- <br /> �t��l�i �� <br /> COiVSTRUCTlOti� <br /> January 30, 2017 <br /> East Pasco Seventh Day Adventist Church <br /> 7333 Dairy Rd. <br /> Zephyrhills,FL 33540 <br /> Proposal for Equipment Storage Building <br /> I'm pleased to provide a quote for a 12' x 20' storage building based upon the following construction <br /> details. <br /> l. Fioor system will be 2 x 6 pt(pressure treated for ground contact) lumber set on 24" <br /> centers with a deck of 3/4"pt plywood. The 2x6 joists will rest on concrete paver block <br /> and the structure will be anchored using tie down anchors that screw into the ground. <br /> 2. The walls will be 2 x 4 studs placed 16"on center. <br /> 3. The roof will be 2 x 4 rafters spaced 24"on center with a 1/2"osb sheating, roof <br /> underlayment,ridge vent(for ventilation), and shingles in a blue color to blend with the <br /> church's current roof color. Fascia will be lx4 fascia with an open soffit detail (rafter <br /> tails will be visible). <br /> 4. The exterior wall of the building will have LP Smartside siding(8' on center grooved <br /> siding)which will be painted to match the color of the church. Interior walls and <br /> ceiling/roof will be exposed framing. <br /> 5. One 8' (width)x 7' (height)roll up door will be installed. The roll up door will have a <br /> ramp of 3/4"pt plywood. One 3' steel door will be installed complete with an entry <br /> lockset. This single door allows the roll up door to be secured from the inside instead of <br /> locking with padlocks on the exterior which I believe will result in a more secure <br /> building. <br /> 6. One 32"x 14"window will be installed in the wall opposite the roll up door. <br /> 7. Two 14"x 14"louver vents will be installed in the gable ends. <br /> I propose to construct the 12' x 20' storage building for the cost of materials only for the sum of <br /> $4,500.00. Payment is to be paid when the work is complete. <br /> Permit costs or other fees will be in addition to the cost above. <br /> Respectfully submitted, <br /> Ken Griffin <br /> Griffin Construction <br /> ll932 Duck Lake Canal Rd � <br /> Dade City,FL 33525 <br /> Email:ken(g�buildwith�iffin.com Ph:352-206-1841 <br />