Laserfiche WebLink
TRINIIY I ERD • <br /> APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE <br /> Table Deck Application Type Description Page „ <br /> 1A Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5-6 <br /> 1B Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 7 <br /> 1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 8-9 <br /> 1D Wood New,Reroof(Tear-Off)or Recover D Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 10-12 <br /> lE-1 Wood New,Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 13-15 <br /> 1E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 16-17 <br /> 1F Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 17 <br /> 2A Steel or Structurel Concrete New,Reroof(Tear-Off)or Recover 8 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 18-20 <br /> 2B Steel or Structural Concrete New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 21-25 <br /> 2C Steel or Structural Concrete New,Reroof(Tear-Off)or Recover D Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 26-28 <br /> 3A Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 29-36 <br /> 3B Concrete New or Reroof(Tear-Off) A-3 Bonded Temp Roof/Vapor Barrier,Bonded Insulation,Bonded Roof Cover 36 <br /> 3C Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 37 <br /> 4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 38-39 <br /> 4B LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 40 <br /> . 4C LWIC New,Reroof(Tear-Of� E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 41-44 <br /> SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 45 <br /> SB CWF New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 46 <br />, SC CWF New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 46 <br /> SD CWF New,Reroof(Tear-Off) E Non-Insulated,Mech.Attached ease Sheet,Bonded Roof Cover 47 <br /> 6A Gypsum Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 48-49 <br /> 68 Gypsum Reroof(Tear-Offl A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 50 <br /> 6C Gypsum Reroof(Tear-Off) C Mech.Attached Insulation,Bonded Roof Cover 51 <br /> 6D Gypsum Reroof(Tear-Offl E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 51 <br /> 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 52-57 <br /> 78 Various Recover F Non-Insulated,Bonded Roof Cover 57 , <br /> The followin�notes applv to the svstems outlined herein: I' <br /> 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the <br /> roof deck shall be documented through proper codified and/or FBC Approval documentation. <br /> 2. Unless otherwise noted,fasteners and stress plates for insulation attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements: ! <br /> ➢ Wood Deck: OMG�i14 Roofgrip with Flat Bottom Plate(Accutrec),OMG HD with OMG 3 in.Galvalume Steel Plate,Dekfast k14 with Hex Plate or 3"Round Insulation Plate,Trufast HD with Trufast 3" <br /> Metal Insulation Plates or FlintFast#14 Fastener with FlintFast 3"Insulation Plates. Minimum 0.75-inch plywood penetration or minimum 1-inch wood plank embedment. <br /> ➢ Steel Deck: OMG tt12 or#14 Roofgrip with Recessed or Flat Bottom Plate(Accutrac),OMG�i12 Standard or HD with OMG 3 in.Galvalume Steel Plate,Dekfast#12 or#14 with Hex Plate or 3"Round <br /> Insulation Plate,Trufast DP or HD with Trufast 3"Metal Insulation Plates or FlintFast#12 or#14 Fastener with FlintFast 3"Insulation Plates. Minimum 0.75-inch steel penetration and <br /> engage the top flute of the steel deck. <br /> ➢ Structural Concrete: OMG#14 Roofgrip with Recessed or Flat Bottom Plate (Accutrac), OMG HD or CD-10 with OMG 3 in. Galvalume Steel Plate, Dekfast#14 or DekSpike with Hex Plate or 3" Round <br /> Insulation Plate,Trufast HD or CF with Trufast 3"Metal Insulation Plates or FlintFast#14 Fastener with FlintFast 3"Insulation Plates. Minimum 1-inch embedment. Fasteners installed <br /> with a pilot hole in accordance with the fastener manufacturer's published installation instructions. <br /> Exterior Research and Design,LLC.d/b/a Trinity�ERD Evaluation Report 3520.03.04-R18 for FL2533-R37 <br /> Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION Revision 18:02/16/2017 <br /> Prepared by: Robert Nieminen,PE-59166 CertainTeed Corporation;(610)651-5847 Appendix 1,Page 1 of 57 <br />