Laserfiche WebLink
�. <br /> " , • . . <br /> FORM R405-2014 <br /> TABLE 4Q2.4.1.1 <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> project Name: Hayden 4EHB Elev D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip; ZephyrhilEs, FL, Permit Number: <br /> Owner: Jurisdiction: <br /> Design Loeation: FL,7ampa <br /> COMPONENT CRITERIA CNECK <br /> Air barrier and therm�l barrier A continuous air barrier shall be installed in the building envelope. <br /> Exteriar thermal envelape contains a cantinuous barrier. <br /> Breaks or joints in the air barrier shall be sealed. <br /> Air-permeable insulation shall not be used as a sealing material. <br /> Ceiiing/attic The air barrier in any dropped ceilinglsoffit shail be aligned with the <br /> insulation and any gaps in the air barrier shall be sealed. <br /> Access openings,drap dawn stairs or knee watl daors to unconditioned <br /> attic spaces shall be sealed. <br /> Corners and headers sha!!be insulated and fhe junctian of ihe foundation <br /> Wa(Is and sil(plate shail be sealed. <br /> The junction af the top plate and the top or exterior walls shall be sealed. <br /> ��cEerior thermal envelope insulaiian for framed wal(s shall be 9nstalled in <br /> substantial contact and continuous alignment with the air barrier. <br /> Knee wa!!s shal!be sealed. <br /> Windows, skyllghts and doors The spaoe between windowldaorjambs and framing and skylights and <br /> framing shall be sealed. <br /> Rim 'oists Rim joists are insulated and include an air barrier. <br /> Floors (ir�cluding abave-garage Insuiatian shall be installed to maintain permanent contact with underside <br /> and cantilevered floors) of subflaor decking. <br /> The air barrier shal!be installed at any exposed edge af insulation. <br /> Cr'�wl sp�ce w�lls Where provided in lieu of floor insulation,insulation shall be permanently <br /> attached to the crawlspace walls. <br /> Expased earth in unvented crawi spaces sha11 be cavered with a Class 1 <br /> vapor retarder with overlapping joints taped. <br /> Shafts, penetratlons Duct shafts, utility penetratians,and flue shaft openings to exterior or <br /> unconditioned space shall be sealed. <br /> N�rrow cavities Batts in narraw cavifies shall be cut ta fit,or narrow cavities shal(be fiiied <br /> by insulation that on installation readily conforms to the available cavity <br /> s aces. <br /> Garage separation Air sealing shall be provided between the garage and conditioned spaces. <br /> ReCessed lighting ftecessed Eight fxtures'instailed in the building thermaE envelope shall be <br /> air tight, IC rated,and sealed to the drywall. <br /> Plumbing and wiring Batt insulatian shall be cut neatly to fit around wiring and plumbing in <br /> exterior walls, ar insula#ion that on installatian readily conforms to available <br /> space shal!extend behind piping and wiring. <br /> Shower/tub on exterior'wall E]cterior walls adjacent to shawers and tubs shall be insulated and the air <br /> barrier instai{ed separating them from the shawers and tubs. <br /> EleCtricallphone box on The air barrier shall be installed behind electrical or communicatian boxes or <br /> aie sealsd boxes shall be installed. - <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope shall be <br /> sealed ta the sub-floor or c3rywall. <br /> Fireplace An air barrier shall be installed on fireplace walls. Fireplaces shall have <br /> gasketed doors <br /> 1 1/4/201 6 4:37 PM EnergyGaugeCN USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1 <br />