My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16796 (2)
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16796 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 10:54:49 AM
Creation date
5/1/2018 10:54:46 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
15-16796
Building Department - Name
TAYSEER,ABED
Address
38529 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2017 <br /> Tayseer Abed <br /> 38529 5th Avenue <br /> Zephyrhills Florida 33542 <br /> RE: 38529 5th Avenue <br /> Zephyrhills Florida 33542 <br /> Dear Mr. Abed, , <br /> City of Zephyrhills Code Enforcement has deemed <br /> your property unsafe under the International <br /> Property Maintenance Code Sections [A] 108. 1. 1 <br /> UNSAFE STRUCTURES [A] , 108. 1.3 STRUCTURE UNSAFE FOR <br /> HUMAN OCCUPACY, and [A] 108. 1.5 DANGEROUS STRUCTURE <br /> OR PREMISES #3, 4, 5 &6. <br /> Due to neglect and faulty construction, the roof <br /> system is likely to collapse and is causing water <br /> intrusion into your mercantile food store. You have <br /> endangered your employees (those working inside and <br /> those attempting to repair the roof system) and the <br /> public as a whole. <br /> At this time, you are required to abate these <br /> unsafe conditions. As part of the process of <br /> abatement, the City of Zephyrhills is requiring you <br /> to remove all loose materials from the roof and <br /> hire a properly licensed, qualified contractor. <br /> Said contractor may sign on existing permit #16796 <br /> or obtain a separate permit. Structural engineering <br /> reflecting necessary repairs will be required. The <br /> removal of loose items shall be completed within 10 <br /> days of receipt of notice and the required repairs <br /> shall be completed within 60 days of receipt of I <br /> notice. Furthermore, occupancy will be restricted <br /> and there shall be no business conducted until said <br /> repairs are complete and approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.