Laserfiche WebLink
` FORM R405-2014 <br /> • • • Florida Department of Business and Professional Regulations � <br /> y � Residential Whole Buildin Performance and Prescri tive Methods <br /> ADDREBS: Nineteenth Street Permit Number: <br /> Zephyrhills, FL,33542 <br /> MAND�4TORY REQUIREMENTS gee individual code sections far full details. I <br /> � 4Q1.3 Erter Ferformance I.eve1 EPL dls !a card Mandato The buildin offiicia)sha1l re uire that an enar i <br /> gY ( } p Y { ry}. g q gY Performance level(EPL) <br /> display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Ftorida law � <br /> [Section 553.9085, Flarida Statues]requires the EPL display card to be included as an addendum to each sales contract far both presold and � <br /> nonpresold residential buildings.The EPL display card contains iriforrrtation indica#ing the energy performance level and efiiciencies of companen#s <br /> installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans <br /> and specificatians submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. <br /> � R402.4 Air leakage{Mac�datary). The buitding thermal envelope shall be construc#ed to limit air leakage in accardance with the raquirements of <br /> Sections R402.1 through R402.4.4 <br /> {} R402.4.'! Ballding thermal�envelope. 1he buiiding therma�envelope shall compty with Sections R442.4.1 1 and f?402.4.12.The <br /> sealing methads between dissimilar materials shall allow for differential expansion and contraction. <br /> • R4Q2.4.1.1 Irtstallatlon.The companents af the building thermal envelope as tisted in Table R442.4.1.i shall be installed in <br /> accordance with the manufacturer's instructians and the criteria listed in Table 402.4.1.1,as applicable to the methad of canstruction. <br /> Where required by the code official,an approved third party shall inspect all components and verify compliance. <br /> • R402.4.1.2 Testing. The bui(ding ar dwelling unit shall be tested and veri�ed as having an air leakage rate of not exceeding 5 air <br /> changes per hour in Climate Zones 1 and 2,and 3 air changes per haur in Climate Zones 3 through 8.Testing shall be conducted with <br /> a blower door at a pressure af Q.2 inches w.g.{50 Pascals}.Where required by fhe code officiat,testing shalt be conducted by an <br /> approved third party'.A written report of the results of the test shall be signed by the party canducting the test and provided to the code <br /> official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. <br /> During testing: <br /> 1. Exterior windows and doors,fireplace and stove doors shall be clased,but not sealed,beyond the intended weatherstripping or <br /> o#her infiltratian contrat measures; <br /> 2.Dampers including exhaust,iniake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyand intended <br /> infil#ration control measures; <br /> 3.Interior doors,if fistalled at the time of the test,shall be open; , <br /> 4. Exterior doars for continuous ventilation systems and heat recovery ventilators shall be clased and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the lest,shall be turned off;and <br /> 6.Supply and retum registers,if installed at the time of the test,shall be fully apen. <br /> O R402.4.2 Flreplaces.New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air. <br /> O R402.4.3 Fenestration air leakage.Windows,skytigh#s and sNding giass doors shall have an air infiltratian rate of no more than 0.3 cfm <br /> per square foot(1.5 Us/m2),and swinging daors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or <br /> AAMAlWDMAtCSA 1 Qi11.S.2lA440 by an accredited,independent laboratory and listed and labeted by the manufacturer <br /> Exceptlon: Site-built windaws,skylights and doors. <br /> O R402.9.4 Recessed Ilghting. Recessed luminaires installed in the building therma!envelope shalf be sealed to limit air leakage <br /> between conditioned and unconditioned spaces.AO recessed luminaires shall be IC-rated and labeled as having an air leakage rate not <br /> more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed <br /> Iuminaires shall be sealed with a gasket or caulk between the housing and the inferiar wa11 or ceiling covering. <br /> � R403.1.1 Thermostat provlsion(Mandatory).At least one thermostat shall be provided for each separate heating and cooling system. <br /> � R403.1.3 Heat pump supplementary heat(Mandatary}.Neat pumps having supplementary electric-resistance heat shall have enntrols <br /> that,exaept during defrost,prevent supplemental heat operatian when the heat pump compressor can meet the hea#ing load. <br /> � R403.2.2 Seal4ng{Mandatory}�!1 ducts,air handlers,a�d filter boxes and building cavities that form the primary a9r containmenf <br /> passageways for air distributian systems shall be considered ducts and plenum chambers,shall be constructed and sealed in accardance <br /> with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction <br /> or rough-in testing betow. <br /> Duct tightness shall be verified by testing to Section BQ9 of#he RESNEf Standards by either an energy rater certified in accordance with Section <br /> 553.99,Fiorida Sta#utes,or as autharized by Florida Statutes,to be"substantially leak free"by either of the following: <br /> 1. Post-construction test:Total leakage shall be less than ar equal to 4 cfm(113 Umin)per 100 square feet(929 m2)of conditioned floar area <br /> when tested at a pressure differentiat of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturer's air handler enc}osure.Afl <br /> register boots sha8 be taped or otherwise sealed during the test, <br /> 2. Rough-in test:Tota!leakage shaA be less than or equa!to 4 cfrn{113 Llmin)per 100 square feet(9.29 m2}of conditioned floar area when tested <br /> at a prsssure differential of 4.1 inches w.g.{25Pa}across the system,including the manufacturer's air handler enctosure.Ati registers shall be <br /> taped or atherwise sealed during the test.If the sir handler is nat installed at the time of the test,total leakage shall be less than or equal to 3 cfm <br /> (85 Umin�per 10Q square teet{9.29 m2)of conditianed floor area. <br /> Exceptions: <br /> 1 The total leakage test is not required for duets and air handlers locatad entirely wiihin the building envefope. <br /> 2. Duct testing is not mandatory for buildings complying by Section R405 of this code. <br /> 9l30/2016 9:56 AM EnergyGaugeO USA-FlaRes2014 -Section R405.4.1 Com Page 1 of 3 <br /> i <br />