Laserfiche WebLink
Cu.�tomer�rder: 147337 ' ersal <br /> Name Paula Morales 1T&��t <br /> Address 6716 Basswood Cir Apt# - <br /> • Corporate Office <br /> City Zephyrhills Cell Phone 5460 Reese Rd, Davie, FL 33314 <br /> State ZIP 33542 Other Phone State Licensed#CAC058142 <br /> Date 5/20/2017 Date Scheduled 5/25/2017 uahac.com(866)999—2665(COOL) <br /> New <br /> Air Handler RH1T3617STANJA <br /> CorYLdenser L�P14�()AJ1N..� <br /> ���er 5 <br /> We Propose To Fumish And Install A New 2.5 Ton 14 SEER Rheem 410A. <br /> 1 Digital Thermostat <br /> 1 Safety Float Switch <br /> 4 Hurricane Tie Downs For Condenser(up to code) <br /> 2 Locking Caps For Freon Valves <br /> Flush Out Freon Lines To Prep For New R410a Refrigerant <br /> Liquid Line Dryer <br /> Vacuum Refrigerant Lines To Negative 30 Ensuring No Air In The Lines Before Start Up <br /> Removal And Legal Disposal Of Old Equipment <br /> Chemically&High PSI Nitro Flush Existing Drain Line <br /> 1 Complete Mechanical Permit With The City <br /> vbration Isolator Pads Under Condenser <br /> Up To 5'Of Refigerant Lines As Needed(Suction and Liquid) <br /> Up to 5'Of Armor Flex Insulation(Air Handler&Condenser) <br /> Properly Level Condenser <br /> Sealed Equipment Connections <br /> 1 plenum transition mastic Seal Inside The Plenum To Ensure No Air Leaks <br /> Sub Cooled/Superheat Refrigerant Charging <br /> Hooked Up To Existing Copper,Electrical,Drain Line 8�Duct Work <br /> 1 Spray Foam Bottom Of The Line Chase <br /> 1 Concrete Slab <br /> 1 Garage Filter Rack <br /> 1 Main Breaker For Condenser <br /> 1 Main Breaker For Air Handler <br /> 1 Free Sporicidin Microbial Treatment(Value 299.00 Per HVAC Zone)With Purchase Of New Unit <br /> •My Elecfical Upgrades Are The Home Owners Responsibility' <br /> 'Balance Due Upon AC Start-Up' <br /> '50%Deposit Is Due Upon Arrival Of Installation And Balance Upon Completion' <br /> `Price Is Only Valid 30 Days" <br /> 1 Year Labor Warranty <br /> 10 Year Factory Parts Warranty In Unit <br /> Choose from one of 3 payment options. <br /> Option 1 ::Total Cost:$4,599.14-Instant Rebate$689.87 Total Cost$3,909.27. Cash,Check or Credit Card <br /> Option 2::Total Cost:$4,599.14-Instant Rebate$574.89 Total Cost$4,024.25. 0%APR for 36 months with equal payments of about$111.78 with approved <br /> credit and terms. <br /> i <br /> Option 3::Total Cost:$4,599.14 Total Cost$4,599.14. 0%APR for 60 months with equal payments of about$76.65 with approved credit and terms. <br /> ❑ Testimonial Video Release SUB-TOTAL $4,599.14 <br /> I Agree To Be Photographed And Videotaped For This Production By Universal Air And Heat Without INSTANT REBATE $689•87 <br /> Receiving Compensation Of Any Kind. i Understand That This Footage May Be Used,As Deemed -UTILITY REBATE AND OR <br /> Appropriate By Universal Air&Heat For Future Producfions Which May Be Viewed By Public And MANUFACTURE REBATE <br /> Private Sector Audiences -DEPOSIT <br /> TRIP CHARGE <br /> Release Signature TOTAL AMOUNT DUE $3,909.27 <br /> Q,�,�.�, y��,,v{� Date: 5/20/2017 <br /> Customer Technician <br />