My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18592
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 2:26:28 PM
Creation date
5/1/2018 2:25:59 PM
Metadata
Fields
Template:
Building Department
Company Name
DRIFTWOOD
Building Department - Doc Type
Permit
Permit #
17-18592
Building Department - Name
RYMAN CONSTRUCTION
Address
6781 BASSWOOD CIRCLE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F�RM R�D5-2014 <br /> � ' ' Florida Department of Business and Professional Regulations <br /> Residential Whole Buildin PerFormance and Prescri tive Methods <br /> ADDRESS: Perrriit Number: <br /> Zephyrhills,FL, <br /> MANDATORY REQUIREMENTS See individual code sections for full details. <br /> � 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) <br /> display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law <br /> [Section 553.9085,Florida Statues]requires the EPL display card to be included as an addendum to each sales contract for both presold and <br /> nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components <br /> installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans <br /> and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. <br /> � R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to Iimit air leakage in accordance with the requirements of <br /> Sections R402.1 through R402.4.4. <br /> Q R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.The <br /> sealing methods between dissimilar materials shall allow for differential expansion and contraction. <br /> • R402.4.1.1 Installation.The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in <br /> accordance with the manufacturers instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. <br /> Where required by the code official,an approved third party shall inspect all components and verify compliance. <br /> • R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air <br /> changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with � <br /> a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an <br /> approved third party A written report of the results of the test shall be signed by the party conduc6ng the test and provided to the code <br /> official.Testing shall 6e perFormed at any time after creation of all penetrations af the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or � <br /> other infiltration control measures; � <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended I � <br /> infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.HeaGng and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. j <br /> O R402.4.2 Fireplaces.New wood-buming fireplaces shall have tight-fitting flue dampers and outdoor combustion air I <br /> O R402.4.3 Fenestration air IeakageWindows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm � <br /> per square foot(1.5 L/s/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 L/s/m2),when tested according to NFRC 400 or ' <br /> AAMAlWDMA/CSA 10111.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. <br /> Exception: Site-built windows,skylights and doors. � <br /> O R402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage <br /> between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not <br /> more than 2.0 cfm(0.944 L/s)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed � <br /> luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. � <br /> � R403.1.1 Thermostat provisfon(Mandatory).At least one thermostat shall be provided for each separate heating and cooling system. I I <br /> � R403.1.3 Heat pump supplementary heat(Mandatory).Heat pumps having supplementary electrio-resistance heat shall have controls � <br /> that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heaUng load. � I <br /> � R403.2.2 Sealing(Mandatory}411 ducts,air handlers,and filter boxes and building cavities that form the primary air containment ' I <br /> passageways for air distribution systems shall be considered ducts and plenum chambers,shall be constructed and sealed in accordance � � <br /> with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction i <br /> or rough-in testing below. <br /> Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section I <br /> 553.99,Florida Statutes,or as authorized by Florida Statutes,to be"substantially leak free"by either of the following: i <br /> 1. Post-construction test:Total leakage shall be less than or equal to 4 cfm(113 L/min)per 100 square feet(9.29 m2)of conditioned floor area i <br /> when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturers air handler enclosure.All <br /> register boots shall be taped or otherwise sealed during the test. � <br /> 2. Rough-in test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested � <br /> at a pressure differential of 0.1 inches w.g.(25Pa)across the system,including the manufacturers air handler enclosure.All registers shall be , i <br /> taped or otherwise sealed during the test.If the air handler is not installed at the time of the lest,total leakage shall be less than or equal to 3 cfm � <br /> (85 L/min)per 100 square feet(9.29 m2)of conditioned floor area. i <br /> Exceptions: � <br /> 1 The total leakage test is not required for ducts and air handlers located entirely within the building envelope. � <br /> 2. Duct testing is not mandatory for buildings complying by Section R405 of this code. <br /> 5/12/2017 1:38 PM EnergyGauge�USA-FlaRes2014 -Section R405.4.1 Com Page 1 of 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.