My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
818-02 Establish Water Facility Connection Fees
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
ORDINANCES
>
2000-2009
>
818-02 Establish Water Facility Connection Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2018 4:30:15 PM
Creation date
6/5/2018 4:30:14 PM
Metadata
Fields
Template:
Administration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i}R 6K 5 1 73 FG 995 <br /> i <br /> 12 of 14 <br /> that one or more of the values used in the applicable Equivalent Dwelling Unit Table <br /> is inappropriate for the proposed Principal Use shall be based upon the one of the <br /> following and must establish a more appropriate value for the proposed Principal <br /> Use; <br /> (i) twenty-four (24) months of water consumption data from three (3) <br /> developments of like type and size calibrated for or otherwise determined to be <br /> applicable to the City of Zephyrhills, as determined by the Department; or <br /> (ii) based upon a study carried out by a professional engineer registered in <br /> the State of Florida using the American Water Works Association Manual MM- <br /> 22 or as amended, "Sizing Water Service Lines &Meters;" or <br /> (iii) the Department may approve alternate acceptable methodology where <br /> appropriate, as determined by the Department. <br /> (3) A petition shall include all of the following: identification of the disputed <br /> value(s),,a detailed statement asserting the basis for the dispute,the data relied on by <br /> the petitioner, and a detailed statement completed by a professional engineer <br /> registered in the State of Florida supporting the use of the revised value(s)proposed <br /> by the petitioner in accordance with the standards set forth in this section. <br /> (4) Within ten (10) days after receipt of a petition, the City Manager shall <br /> forward the petition and supporting documentation to the City Utilities Department <br /> for review and recommendation. Following receipt of the Utilities Department's <br /> recommendations the City Manager shall,within sixty(60) days following the filing <br /> of a complete petition,render a decision to: approve the petition if it is demonstrated <br /> that one or more of the variables identified in Section 14(c)(1) as used in the <br /> Equivalent Dwelling Unit Table is inappropriate based upon the standards <br /> incorporated in this section; or deny the petition. The sixty (60) day time period <br /> will be suspended upon transmittal by the Utilities Department of a written request <br /> for additional data or information, until all requested data or information has been <br /> received. Upon agreement by the City Administrator and the applicant, the time <br /> limits established under this section may be waived. The filing of a petition shall <br /> stay action by the City on an application for service and/or building permit or other <br /> City action related to the development activity,unless bond or other sufficient surety <br /> is filed or the total Capacity Fee is paid. <br /> (5) If the City Manager approves the petition,the Capacity Fee for the proposed <br /> demand category shall be recalculated using the revised value(s) proposed by the <br /> petitioner using the methodology of the Department. <br /> (d) After determination of: (1)the amount of the Capacity Fee,which occurs at the time <br /> of application for service and/or building permit is defined in this Ordinance, or at the time <br /> of issuance of a determination on a petition under Section 14(c)(5) of this Ordinance, <br /> whichever occurs later in time; (2) the amount of the credit, which occurs at the time of <br /> issuance of a determination on a petition under Section 14(c)(5) of this Ordinance; or (3) <br /> the amount of the refund due,which occurs at the time of issuance of a determination on a <br /> petition under ;Section 14 c 5 of this Ordinance, an applicant for an application for <br /> ( )( ) PP PP <br />
The URL can be used to link to this page
Your browser does not support the video tag.