My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
640-96 Amend Comprehensive Plan
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
ORDINANCES
>
1990-1999
>
640-96 Amend Comprehensive Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 9:31:42 AM
Creation date
6/7/2018 9:31:42 AM
Metadata
Fields
Template:
Administration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f OR aK , 9 B,, r s 1.6-3s'' <br /> a of 8 <br /> a LOS of 1.5 tons per year, it is estimated that this site could generate 24 tons per yea . <br /> (3) Nye: Using actual figures for the site immediately east, it is expec -d that this site <br /> will generate 1.5 tons annually. Furthermore, small office operations within the ty are presumed <br /> to generate tonnage similar to that of a single family dwelling unit. <br /> (4) Townview Medical Arts Partnership: The four acres ,,esignated commercial <br /> land use, can be expected to generate 53 tons of solid waste per year. ► 's figure is based upon <br /> figures used in previous amendments pertaining to like development. For - ample, it is assumed that <br /> 35 acres of commercial/medical facilities developed at maximum, wil generate 142 yards of solid <br /> waste per week, or 7,384 yards annually. Dividing that figure by acreage and then converting <br /> yardage to tonnage, results in a four acre parcel generating 53 tons %f solid waste per year. For the <br /> remainder of this parcel, the City estimates each dwelling unit ge erates 1.5 tons annually. With a <br /> highest use figure of 207 units on the remaining 31 acres, total olid waste usage is 310.5 tons per <br /> year. <br /> All solid waste collected within the City of ephyrhills is i elivered to the Pasco County Transfer <br /> Station, and in turn delivered to the Pasco Resource Reco ery Plant. The Resource Recovery Plant <br /> has capacity to handle 1,050 tons per day. Pasco County timates it will be at least nine years before <br /> the plant reaches its capacity. <br /> These annexations will not adversely impact he City's solid waste service. <br /> C Drainage: <br /> Florida Adventist Association <br /> Smith Cattle and Grove <br /> Nye Annexation <br /> Townview Medical Arts Pa'1 nership <br /> All sites under deye1 pment or redevelo.ment within the City of Zephyrhills handletheir drainage <br /> (run-of) on site. Each is treated as a ne facility and all development is required to provide on-site <br /> retention of stormwater of sufficient c. e acity to assure that post-development run-off is no greater <br /> than pre-development conditions. T e adopted level of service standard is a 25 year storm of 3.6 <br /> inches of rainfall in one hour. <br /> These annexations will not adversely impact the City's drainage service. <br /> D. Traffic Circulation: <br /> (1) Florida AAventist Association: This parcel, with potential development of a <br /> church, can be expected to g: erate 63 trips daily. <br /> (2) Smith le and Grove: This site,with potential build-out of 26,000 square feet, <br /> is expected to generate 1 -440 trips per day at full use. Interim construction of the initial 7,000 square <br /> feet will generate 395 trips per day. <br /> (3) Nye: This half acre parcel will be joined for development with a similarly sized <br /> site that currently is used.as a professional office. A like use.is expected, and will generate 52 daily <br /> trips. <br /> (4) Townview Medical Arts Partnership: Again, using actual figures for similar <br /> development, this 4 acre commercial parcel is estimated to generate 848 trips daily. This figure is <br /> based on actuals that a parcel twice this size with like development generates 1,696 trips daily. For <br /> the 11.5 acres planned for single family development, with a potential build-out of 3.3 units per acre <br /> and an average 9.25 trips per day, can expect to generate 351 trips daily. The 19.5 acres planned for <br /> multi-family use and with a build-out of 175 units and an average of 7.52 trips daily, can expect to <br /> generate 1,316 trips per day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.