Laserfiche WebLink
accordance with the specifications of said code, together <br /> with other provisions of this chapter in all respects , as <br /> if all the provisions of said code had been set forth <br /> herein verbatim. <br /> 6 . 8 STANDARDS SUPERCEDING 6 . 7 ABOVE . <br /> Notwithstanding the provisions of 6 . 7 , pertaining to <br /> Electrical Construction the following subsections set <br /> forth hereafter shall apply. <br /> 6. 9 USE OF WIRING OR APPARATUS PRIOR TO INSPECTION AND <br /> CERTIFICATION. <br /> It shall be unlawful for any person to use any <br /> electrical current in or through any wiring apparatus or <br /> fixtures for light , heat or power in or on any building <br /> or structure within the limits of the city, until the <br /> same shall have been inspected and approved by the <br /> 111 electrical inspector and the certificate provided for in <br /> subsection ( 9) of section 9-12 shall have been issued <br /> therefor . <br /> 6 . 10 CONNECTION OF SUPPLY BY ELECTRIC COMPANY PRIOR TO <br /> INSPECTION, APPROVAL AND ISSUANCE OF COMPLETION PERMIT. <br /> The person currently holding a franchise from the <br /> city to furnish electric power to the residents of the <br /> city shall not connect the meter or install electric <br /> service to any new construction or building within the <br /> corporate limits of the city, unless the electrical <br /> installations thereof have been inspected and approved by <br /> the electrical inspector . <br /> 6. 11 ISSUANCE OF FINAL CERTIFICATE OF INSPECTION. When <br /> any electrical wiring , apparatus or fixtures covered by a <br /> permit shall be found , on inspection by the electrical <br /> inspector, to conform to the rules and regulations <br /> provided by this chapter the electrical inspector shall <br /> 0. R. 1372 PG'. 0.756 <br />