Laserfiche WebLink
Jacqueline Boges <br /> From: Bill Burgess <br /> Sent: Monday, October 16, 20171:47 PM <br /> To: ada@adaarchitects.cc <br /> Cc: Kalvin Switzer; Gene Brown; Jacqueline Boges <br /> Subject: Harbor Freight Zephyrhills Florida Project#17165 <br /> Good Afternoon, <br /> I am in receipt of a letter from Dan Van Luvender.The letter states that additional support framing(as shown on plans <br /> A-4.2/6) is not required for the loads of the new roof top units.The letter references that the structural engineer of <br /> record has submitted calculations to the fact....Unfortunately we do not show record of these calculations or the <br /> supporting document.The approved plan however does show additional support framing needed as referenced on Page <br /> D1.0 Note 218 and shown on A4.2/6....If this framing is no longer required I will need a signed sealed letter from the <br /> Engineer of Record....Corrections or supporting documents will be required prior to Certificate of Occupancy. <br /> Sincerely, <br /> William A. Burgess <br /> Building Official <br /> City Of Zephyrhills <br /> 1 <br />