Laserfiche WebLink
• • SYSTENi' SPEGIFtC C403.4.3.4 IViechanica) Temperature reset by representative buitding � � � <br /> � loeds in pumping systems for chiller and boiler <br /> systems>340,OQQ Btulh. <br /> SYSTEM_SPECiFIC C403.4.4 Mechanical �an sys#ems wifh mofors>=7.5 hp associated � � � <br /> � with heat'rejectian equipment ta have capability to <br /> operate at 2!3 of full-speed and auta speed <br /> controls ta contro!fhe teaving flaid temperature or <br /> candensing temp/pressure of heat rejection <br /> device. <br /> Plan Review G406 ProJeet Plans,specifications,and/or calautations pravide � � � <br /> ail information with which compliance can be <br /> i deterrrtined for the additionai energy efficiency - <br /> " � package options. <br /> ' i.`t Plan Review C402.3.2.2 Envelope Skylights in office,storage,automotive service, � � � <br /> manufacturing,non-refrfgerated warehouse,retai! <br /> stara,and disfribufionlsatting area have a <br /> measured haze value>90 percent unless <br /> designed to exclude direct suniight. ; <br /> ,. . -_ - =..x. - _ - _- _ _ ---. ... . ..- �--. - - <br /> i- - - . <br /> °3:�To:�lie„ 'ec - - , <br /> -_ `;,t - . _ ch ked"b;'�:Ins'_e�c:tor-� - <br /> - , _ _ -_ - .Y. P. <br /> _�.�__.,._..:e_�.. .. ._�__._�»� ___.__...._.._ s��..._.�..�._..W,__n_._�._��.�".�....�...�.._.._.�...�..e.�_..._.�_�,a_...�_u�_W�.�___.__�__.n_��__�_..� <br /> Air Leakage C402.4.1,C4d2.4.2 Enve(ope The bui�ding envelope contains a continuous air � � � <br /> barrier that is sealed in an approved manner and <br /> either consfroctad or tested in an approved <br /> manner. Air barrier penetrations are sea(ed in an <br /> approved manner. <br /> Air Leakage C4Q2.4.3,C9�Q2.4.4 Envelope Factory-bullt fenesfration and doors are labeled � � � <br /> as meeting air leakage requirements. <br /> Air Leakage C4Q2.4.1.1 Envelope Al!sources of air leakage in the building therma! � ❑ � <br /> envetope are sealed,caaiked,gasketed,weafher <br /> stripped ar wrapped with moisture <br /> vapor-permeable wrapping material to minimize <br /> • air leakage. ' <br /> Air Leakage C402.4.6 Envelope Weatherseals installed on all loading dock carga � � ❑ ' <br /> doors. <br /> Air Leakage C402.4.8 Envelope Recessed(uminaires in fhermal enveiope to(imit � � � <br /> infiltration and be IC rated and labeled.Seal <br /> between interior finish and luminaire housing. <br /> Fenestration C303.1.3 Envelope Fenestration products rated in accordance with �' � � <br /> NFRC. <br /> Fenesfratian C303.1.3 Envelope Fenestratian products are certifiad as ta � � � <br /> . performance labels or certificates provided. <br /> Insulation C303.2 Envelope Below-grade wall insulation instaNed per � ❑ � <br /> manufacturer's instrucfions, <br /> insulation C303.2 Envelope Slab edge insulation installed per manufaoturer's ❑ � � <br /> instructions. <br /> Insulation C403.2.7,G408.2.8,( Envelope Exterior insulation protected against damage, � � ❑ <br /> sunlight,moisture,wind,landscaping and <br /> equipment maintenance activifies. <br /> Insulation C402.4.2.1 Envelope Roof R-value.For some ceiling systems, � � � <br /> verification may need to occur during Framing <br /> Inspecfion. <br /> Insulation C303.2 Envelope Roof insulation installed per manufacturer's ❑ ❑ � ' <br /> instructions. Blown or poured loose-fil(insulation <br /> is installed only where the roof slape is<-3 in 12. <br /> Insulation C402.2.1 Envelope Skylight curbs are insulated to the level of roofs � � ❑ <br /> with insulation abave deck or R-5. <br /> lnsu(ation C303.2 Enve(ope Above-grade wail insulatian instal(ed per � � � <br /> manufacturer's instructions. � <br /> 2nsulation G303.2 Envelope Floor insuEation installed per mantafacturer's � � � i <br /> instructions. � <br /> lnsulation C303.1 Envelope 8uilding envelope insulation is fabeled with � � � � <br /> - R-value or insulafion cerfi�icate providing R-value <br /> and other relevant data. <br /> lnsulation C303.2.1 Envelape E�erior insulation is protected frorrt damage with � � � <br /> a prafective material.Verification for exposed <br /> foundation insulation may need to accur during <br /> Foundatiort Inspection. <br /> EnergyGauge Summit0 Fla/Com-2q14.TAM 2014-1.0 Compliant Software.Etfective Date:June 3Q,2015 <br /> 6/1212017 Page 11 of 14 <br />