ADDITIONAL PROVISIONS: Unless otherwise specificd herein,the following addiNonal provisions,terms and conditions and prices are eacpressly �
<br /> incorporated into this contract:
<br /> 1. Permits&Inspections. Code Engineered Systems,Inc.,hereafter referred 8. Damage Due to Nature of Work Due to the nature of the work to be done
<br /> to as"Contractor,"will be responsible for scheduling all progtessive and final at the Owner's request,Contractor will not be responsible for cracks in the
<br /> roof inspections for any permits obtained by Contractor. ceilings,walls,driveways,curbs and sidewalks,falling debris,fixtures or
<br /> 2. Change Orders. Should Owner,construction lender,inspector,or any plaster,damage to flowers,shrubs and other plant life,interior fixtures or
<br /> government body require any modifications to the work covered under this contents,or any other such damages,due to the loading,unloading,removal or
<br /> contract,any wst incurred by Contractor shall be added to the contract price as replacement of the roof.
<br /> extra work and Owner agrees to pay Contractor his norma]selling price for such Note:Damages,such as the ones listed above,often occur due to previous
<br /> work. All extra work,as well as any modifications to the original contract,shall improper installation of drywall,plaster,fixtures,concrete,driveways,etc.
<br /> be specified and approved by both parties in a written change order Al]change 9. Limited Liability Induced by Building Code Requirements. (1)Due to
<br /> orders shall become a part of this contract and shall be incorporated herein. In the limited spectrum of materials allowed by the building codes,the customer
<br /> the event the substrate roof condition results in ponding pursuant to the Standard agrees to not hold Contractor liable for leakage or damage to interior contents
<br /> Building Code and modifications are required to correct the current substrate that might occur from the date of commencement of roof repairs,reroofing,or
<br /> roof so ponding will not occur,Conriactor will notify the Owner/Buyer upon other roofing services through the date of completion of such work. (2)It is a
<br /> learning of such requirements. building code requirement that the nails penetrate through the decking.
<br /> 3. Owner's Responsibility: Insuranee,etc. (1)to relocate and protect any Therefore,Contractor shall not be held responsible for damages to water lines,
<br /> item that prevents Contrac[or from having free access to the work areas such as copper tubing,air condition lines,electrical wiring,pvc piping,etc.in attic
<br /> but not limited to TV or satellite antennas,vehicles,tools,patio,pool or garden space.Damages such as these should be discussed with the party responsible for
<br /> equipment,sprinkler heads,plants,animals,air condition units,solar panels, the installation of such components,as they may have installed these
<br /> solar water heaters,etc. In the event that Owner fails to relocate or protect such components too close to the decking.
<br /> items,Contractor may relocate or protect these items as required,but in no way 10. Withhoiding Payment Due to Inspections or Work by Other
<br /> is Contractor responsible for damage to these items during their relocation and Contractors. (1)Payment ofall or part ofthis contract shall be due as stated under the
<br /> during the perFormance of the work.(2)to correct any existing defects which are payment terms on the reverse side of this contract. Payment to Contractor shall in no way
<br /> recognized during the course of the work. Contractor shall have no liabi]ity for be contingent upon acceptance of work performed by others,inspections by local building
<br /> correCting any existing defeCts such as,but not limited to,dry rot,Structural authorities or any other inspectoc Payments due and unpaid under the Contiact shall bear
<br /> defects,or code violations. (3)to maintain prOperty inSurdnCe with Flre,Course �nterest from the date payment is due at the rate of eighteen percent(18%)per annum or at
<br /> the highest rate allowed by]aw [f the Owner does not pay the Conhactor the payments
<br />' of Construction,all Physical Loss with Vandalism and Malicious MiSChief specified under this Contract,the Contractor may stop the work until payment of the
<br /> clauses attached,in a sum at least equal to the contract price,prior to and during amount owing has been received. [n such event,the Contract price shall be increased by the
<br /> the perfortnance of this contract. If the project is destroyed or damaged by an amount of the Conhactor's reasonable cost of shutdown,delay and start-up. If it becomes
<br /> accident,disaster,calamity,or by theft or vandalism,any work or materials necessary to incur any expenses in the couection ofany money due hereunder,including
<br /> supplied by Contrdctor in reroofing or restoring the project shall be paid for by reasonable a[torney's fees,these expenses will be paid by the Owner/Buyer or his Acting
<br /> Owner as extra work. Agent. (2)Service warranty and/or correction work will cease and not be performed by
<br /> 4. Delay. Contractor shall not be held responsible for any damage occasioned Contractor if Owner's payment as set forth in this contract is not made as specified.
<br /> by delays resulting from work done by Owner's subcontractors,extra work,acts 11. Manufacturer Defects. Contractor shall not and cannot be held
<br /> of Owner or owner's agent including failure of Owner to make timely progress responsible for any roofing material such as cement rile,shingles,metals,wood,
<br /> payments or payments for extra work,shortages of materials and/or labor,bad etc.changing color or shape. This is an issue that should be corrected by the
<br /> weather,fire,strike,war,governmental regulations,or any other contingencies manufacturer
<br /> unforeseen by Contractor or beyond Contractor's reasonable control. 12. Cancellation. If contract is cancelled after 3 days from the date of signing,
<br /> 5. Right to Stop Work and to Withhold Payment on Labor and Materials. the Owner/Buyer shall forfeit 50%of any previous deposit tha[has been made,
<br /> If any payment is not made to Contractor as per this contract,Contractor shall unless work has commenced. If work has commenced,the Owner agrees to pay
<br /> have the right to stop work and keep the job idle until al]past due progress Contractor his normal selling price for work performed up to the date of
<br /> payments are received. cancellation.
<br /> 6. Collection. Owner agrees to pay all collection fees and charges including �3. Association/Deed restrictions. It shall be the sole obligation of the Owner
<br /> but not limited to all legal and attorney fees that result should Owner default in to determine the existence of any restrictions contained in deeds,subdivision or
<br /> payment of this contract. Overdue accounts are subject to interest charged at the neighborhood rules and regulations which might relate to or restrict the
<br /> rate of 18%per annum or at the highest rate allowed by law improvements outlined in this contract. Contractor shall have no liability or
<br /> 7. Legal Fees. In the event litigation or arbitration arises out of this conhact, responsibility for any such non-conformity to or with such restrictions or
<br /> prevailing party(ies)are entitled to all legal,arbitration,and attorney fees. The requirements. Contractor shall be entitled to payment from OwnerBuyer of all
<br /> court or arbitrator shall not be bound to award fees based on any set fee schedule sums due hereunder notwithstanding any injunction or prohibition against the
<br /> but shall,if it so chooses,award the true amount of all costs,expenses,and work as a result of any violation of such restriction or requirement.
<br /> attorney fees paid or incurred.
<br /> Wood re lacement rice sheet:
<br /> Decldng Prices Fascia&Truss End
<br /> S ruce Cedar
<br /> 1/2"Plywood $50.00 per sheet 1"x4" $3.00 per linear foot $4.00 per linear foot
<br /> 5/8"Plywood $60.00 per sheet 1"x6" $4.00 per linear foot $5.00 per linear foot
<br /> 3/4"Plywood $75.00 per sheet 1"x8" $5 00 per linear foot $6.00 per linear foot
<br /> 1"x4"Spruce $2.50 per linear foot 1"x10" $6.00 per linear foot $8.00 per linear foot
<br /> 1"x6"Spruce $3.00 per linear foot 1"x12" $7.00 per linear foot $9.00 per linear foot
<br /> 1"x8"Spruce $3.50 per linear foot 2"x4" $3.00 per linear foot $4.00 per linear foot
<br /> ]"x10"Spruce $4.00 per linear foot 2"x6" $4.00 per linear foot $7 00 per linear foot
<br /> 1"x12"Spruce $4.50 per linear foot 2"x8" $5.00 per linear foot $9 00 per linear foot
<br /> I"x6"Tongue&Groove $4.50 per linear foot 2"x10" $6.00 per linear foot $12.00 per linear foot
<br /> 2"x I 2" $7.00 per]inear foot $14.00 per linear foot
<br /> 1/4"or 3/8"wood soffit will be replaced at$5.00 per linear foot.
<br /> Remove&rehang existing gutters in ordet to replace rotten wood:$2.00 per linear foot(labor only).
<br /> Remove&reinstall aluminum so�t in order to replace rotten wood: $2.00 per linear foot(labor only).
<br /> Page 2 of 2